Revision 03 - Revised Kitchen layout and hoods/equipment revised-------------------------------------------------------------REV02: LOCATION OF THE 1HR FIRE RATED WALL MOVED. UNIVERSAL BARRIER FREE…
Revision 02 - Revised Kitchen layout and hoods/equipment revised-------------------------------------------------------------REV01: LOCATION OF THE 1HR FIRE RATED WALL MOVED. UNIVERSAL BARRIER FREE…
REV02 : LOCATION OF THE 1HR FIRE RATED WALL MOVED. UNIVERSAL BARRIER FREE WASHROOM LOCATION CHANGED.HVAC - Interior renovation to existing warehouse and commercial kitchen
REV02: LOCATION OF THE 1HR FIRE RATED WALL MOVED. UNIVERSAL BARRIER FREE WASHROOM LOCATION CHANGED.Plumbing - Interior renovation to existing warehouse and commercial kitchen
REV01: LOCATION OF THE 1HR FIRE RATED WALL MOVED. UNIVERSAL BARRIER FREE WASHROOM LOCATION CHANGED.Interior renovation to existing warehouse and commercial kitchen
Decommissioning of existing 25mm diameter water service line at main & installation of new 50mm diameter water service connection with existing 150mm diameter fire watermain via 150x150x50 tapped tee.