100 QUEEN'S PARK
Proposal to remove and reinstall fire protection at infill portion at ROM. (Before the bridge at 90 Queen's Park (Which is connected to 100 QP) is demolished)
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal to remove and reinstall fire protection at infill portion at ROM. (Before the bridge at 90 Queen's Park (Which is connected to 100 QP) is demolished)
Rev 02 - Modifcations to the HVAC and plumbing distribution. Minor update to the duct work to add an access door for exhaust duct work. Deletion of fire damper supply and install scope at the B1 le…
rEV 03 - Modifcations to the HVAC and plumbing distribution. Minor update to the duct work to add an access door for exhaust duct work. Deletion of fire damper supply and install scope at the B1 le…
Proposed infill portion of south wall - facade retrofit after demolishing planetarium (including connection between both planetarium and museum)
Revision # 2 modifcations to the HVAC and plumbing distribution. Minor update to the configuration of the below grade Pump Rm. REVISION - as per the bubbled drawingsHVAC - Interior and Exterior ren…
REVISION #4 - modifcations to the HVAC and plumbing distribution. Minor update to the configuration of the below grade Pump Rm. REVISION #3- as per the bubbled drawingsInterior renovations to the R…
Revision 01 - modifcations to the HVAC and plumbing distribution. Minor update to the configuration of the below grade Pump Rm. Plumbing - Interior and Exterior renovations to the Royal Ontario Mus…
REVISION 01: This permit permit is being submitted to remove the crossing out for the exterior work related to the permit. Drain - Interior and Exterior renovations to the Royal Ontario Museum rela…
REVISION #3- as per the bubbled drawingsInterior renovations to the Royal Ontario Museum related to the Bloor Street entrance.
REVISION - as per the bubbled drawingsHVAC - Interior and Exterior renovations to the Royal Ontario Museum. Renovations largely focus on the 2007 Crystal addition. Minor alteration to the 1933 ROM …
Revision #2 - construction of the canopy along the Bloor St W frontage which was crossed off the Revision 01 drawings - Royal Ontario Museum
HVAC - Proposed addition of the boiler and electrical room on the existing mechanical penthouse level. Relocation of roof drains and addition of new floor drains in the new boiler room.
Proposed addition of the boiler and electrical room on the existing mechanical penthouse level. Relocation of roof drains and addition of new floor drains in the new boiler room.
Plumbing - Proposed addition of the boiler and electrical room on the existing mechanical penthouse level. Relocation of roof drains and addition of new floor drains in the new boiler room.
REV#1: remove the crossing out for the exterior work related to the permit. Interior renovations to the Royal Ontario Museum related to the Bloor Street entrance.
Removal and disposal of existing HVAC system and installation of a new Air Handling Unit (AHU SF-26)
FS - Sprinkler Shop Drawing - Interior and Exterior renovations to the Royal Ontario Museum related to the Bloor Street entrance.
Drain - Interior and Exterior renovations to the Royal Ontario Museum related to the Bloor Street entrance.
Interior renovations to the Royal Ontario Museum related to the Bloor Street entrance.
Plumbing - Interior and Exterior renovations to the Royal Ontario Museum. Renovations largely focus on the 2007 Crystal addition. Minor alteration to the 1933 ROM addition.