Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Plumbing - Proposal for interior alterations on third and forth floor.
HVAC - Proposal for interior alterations on third and forth floor.
Revision to hvac - kitchen reconfiguration.Plumbing - Proposal for interior fit-up for a new restaurant.
Revision to kitchen reconfiguration.HVAC - Proposal for interior fit-up for a new restaurant.
Revsion 01: Revision to approved kitchen layout.Proposal for interior fit-up for a new restaurant.
Plumbing - Proposal for interior fit-up for a new restaurant.
Proposal for interior fit-up for a new restaurant.
HVAC - Proposal for interior fit-up for a new restaurant.
Proposal for interior fit-up for a new restaurant.
HVAC - Proposed work is an interior office fit-out inside suite 610 on the existing 6th Floor of the Schwartz Reisman Innovation Campus West Tower. The program of the proposed work includes two ope…
Proposed work is an interior office fit-out inside suite 610 on the existing 6th Floor of the Schwartz Reisman Innovation Campus West Tower. The program of the proposed work includes two open works…
Plumbing - Proposed work is an interior office fit-out inside suite 610 on the existing 6th Floor of the Schwartz Reisman Innovation Campus West Tower. The program of the proposed work includes two…
Interior alterations to offices in Unit 580
HVAC - Interior alterations to offices in Unit 580
Plumbing - Interior alterations to offices in Unit 580
Revision 03: stamped record drawings for levels 1-4 are provided as required by the inspector to align the as-built conditions with the general intent of the previously submitted design drawingsREV…
REV #2-Building revisions to building permit 20 107981 BLD 01 NB. Provision for property owners and municipality to enter into a limiting distance agreement of 2.8m past the north property line to …
REV #1-FIRE COMPARTMENT TO INCREASE UNPROTECTED OPENINGS TO NORTH ELEVATIONProposal to construct a new 15 storey building with office and institutional uses (classrooms), 1 level of below grade par…
REV #1-FIRE COMPARTMENT TO INCREASE UNPROTECTED OPENINGS TO NORTH ELEVATIONHVAC - Proposal to construct a new 15 storey building with office and institutional uses (classrooms), 1 level of below gr…
Page numbers are hidden until the total count is available from the data service.