Revision 1: Proposal to remove the elevator.Proposal for 3rd & 4th floor addition and interior alteration to an existing 2 storey mixed-use building. Scope of work includes 1 residential unit and a…
Plumbing Revision 01 - Remove the elevator and bathroom from roof plan.--------------------------------------------------------------Plumbing - Proposal for 3rd & 4th floor addition and interior al…
HVAC Revision 01 - Remove the elevator from roof plan and to relocate the AC-----------------------------------------------------------HVAC - Proposal for 3rd & 4th floor addition and interior alte…
HVAC - Proposal for 3rd & 4th floor addition and interior alteration to an existing 2 storey mixed-use building. Scope of work includes 1 residential unit and a rooftop deck & pool.
Proposal for 3rd & 4th floor addition and interior alteration to an existing 2 storey mixed-use building. Scope of work includes 1 residential unit and a rooftop deck & pool.
Plumbing - Proposal for 3rd & 4th floor addition and interior alteration to an existing 2 storey mixed-use building. Scope of work includes 1 residential unit and a rooftop deck & pool.