Status summary
Final actions and disposition on the docket.
Infrastructure and Environment Committee · 2026-05-06
- 11 structured lines in this file · ward references on 3 lines.
Top takeaways
Counts and lines taken only from fields in this file—not predictions or editorial ratings.
- Approved / confirmed: 5
- Amended: 3
- Referred: 1
- Additional listed outcomes: 2
Items with changes or notable statuses
Amendments, deferrals, referrals, non-approval, and other notable status lines from this file—up to eight. Hover or focus tags for what each label means.
2025-2026 Annual Winter Maintenance Report and Amendment to Blank… — amended
Amended2026 Annual Strategic Capital Coordination Report and Progress Up… — amended
AmendedAmending the Foundation Drainage Policy and Storm Sewer Quality L… — amended
AmendedOdour from the Ashbridges Bay Wastewater Treatment Plant — updated
Keyword/status matchForensic Audit of the 2021 Winter Maintenance Procurement — referred
Referred
Item-by-item record
Expand rows for detail. Filters apply to this list only (same data as the summaries above).
Filter item list
11 lines in this record.
2026.IE29.1
2025-2026 Annual Winter Maintenance Report and Amendment to Blanket Contracts C78, C87, C88 and C89 with Rafat General Contractor Inc., for the Non-Exclusive Supply of All Labour, Equipment and Material Necessary to Provide Single, Tandem and Tri Axle Dump Trucks with Operators for Trucking Services
Outcome: Amended
Ward: All
2026.IE29.1a
2025-2026 Annual Winter Maintenance Report and Amendment to Blanket Contracts with Rafat General Contractor Inc. for the Non-Exclusive Supply of All Labour, Equipment and Materials Necessary to Provide Single Axle, Tandem and Tri Axle Dump Trucks with Operators for Trucking Services
Outcome: No action
Ward: All
2026.IE29.2
Forensic Audit of the 2021 Winter Maintenance Procurement
Outcome: Referred
Ward: All
2026.IE29.3
Transition of the Blue Box Program to Extended Producer Responsibility: First Quarter 2026 Post-Transition Implementation Update
Outcome: Adopted
Ward: All
2026.IE29.4
2026 Annual Strategic Capital Coordination Report and Progress Update on Enhancing Capital Construction Delivery
Outcome: Amended
Ward: All
2026.IE29.6
Amending the Foundation Drainage Policy and Storm Sewer Quality Limit for Manganese
Outcome: Amended
Ward: All
2026.IE29.9
Odour from the Ashbridges Bay Wastewater Treatment Plant
Outcome: Without recommendations
Ward: 14 - Toronto - Danforth
2026.IE29.5
2026 Road Classification Amendments
Outcome: Adopted
Ward: 3 - Etobicoke - Lakeshore, 7 - Humber River - Black Creek, 10 - Spadina - Fort York, 21 - Scarborough Centre
2026.IE29.7
Feasibility of Requiring Side Guards on Contractor Commercial Vehicles Operating in the City of Toronto
Outcome: Adopted
Ward: All
2026.IE29.8
Update on MM28.22 - Improving Toronto's Public Washrooms
Outcome: Adopted
Ward: All
2026.IE29.10
Supporting the Proposed Modernization of Ontario’s Framework for Power-Assisted Bicycles (E-Bikes)
Outcome: Adopted
Ward: All
| # | Subject | Outcome | Wards |
|---|---|---|---|
| 2026.IE29.1 | 2025-2026 Annual Winter Maintenance Report and Amendment to Blanket Contracts C78, C87, C88 and C89 with Rafat General Contractor Inc., for the Non-Exclusive Supply of All Labour, Equipment and Material Necessary to Provide Single, Tandem and Tri Axle Dump Trucks with Operators for Trucking Services | Amended | All |
| 2026.IE29.1a | 2025-2026 Annual Winter Maintenance Report and Amendment to Blanket Contracts with Rafat General Contractor Inc. for the Non-Exclusive Supply of All Labour, Equipment and Materials Necessary to Provide Single Axle, Tandem and Tri Axle Dump Trucks with Operators for Trucking Services | No action | All |
| 2026.IE29.2 | Forensic Audit of the 2021 Winter Maintenance Procurement | Referred | All |
| 2026.IE29.3 | Transition of the Blue Box Program to Extended Producer Responsibility: First Quarter 2026 Post-Transition Implementation Update | Adopted | All |
| 2026.IE29.4 | 2026 Annual Strategic Capital Coordination Report and Progress Update on Enhancing Capital Construction Delivery | Amended | All |
| 2026.IE29.6 | Amending the Foundation Drainage Policy and Storm Sewer Quality Limit for Manganese | Amended | All |
| 2026.IE29.9 | Odour from the Ashbridges Bay Wastewater Treatment Plant | Without recommendations | 14 - Toronto - Danforth |
| 2026.IE29.5 | 2026 Road Classification Amendments | Adopted | 3 - Etobicoke - Lakeshore, 7 - Humber River - Black Creek, 10 - Spadina - Fort York, 21 - Scarborough Centre |
| 2026.IE29.7 | Feasibility of Requiring Side Guards on Contractor Commercial Vehicles Operating in the City of Toronto | Adopted | All |
| 2026.IE29.8 | Update on MM28.22 - Improving Toronto's Public Washrooms | Adopted | All |
| 2026.IE29.10 | Supporting the Proposed Modernization of Ontario’s Framework for Power-Assisted Bicycles (E-Bikes) | Adopted | All |