71 FRONT ST W

Revision Issued

Last refreshed on May 24, 2026

Permit number
25 148021 MSA
Permit type
Mechanical(MS) · Transit Station,Subway, Bus Terminal
Applied
2025-08-07
Issued
2025-10-22

Actions

Create monitor from this address

Exact address alerts may depend on monitor support.

Report data issueOpens your email app with this record prefilled.

Timeline

  1. Applied

    2025-08-07

  2. Issued

    2025-10-22

  3. Completed

    Not available

Project description

REV 01 - Revision to permit to account for added 100 mm dia. excess steam pumped condensate pipe routing and connection to existing City of Toronto 350mm dia. sanitary inside the MOAT. Updated routing for the DCW piping and fire standpipe to go through Bicycle Storage Room wall, down into void space and then through the 1929 wall into the GO Boiler Room and service corridor ceiling at the existing Union Station concourse level, respectively. Relocated the DCW meter and assembly in GO Boiler Room.Mechanical, electrical, and IT services implemented north of USEP project limit (10 ft North of 1929 wall) for running the conduit/pipes, to occur concurrently with USEP construction to accelerate overall project completion. (Related to Main Building Permit 22 237137 BLD 00 NB).

Permit fields

City area grid code
S1037
Current use
Transit Station
Estimated construction cost
$0
Postal code
M5J
Proposed use
Transit Station
Record created
2026-05-24T02:16:14.401664+00:00
Revision
1
Street name
FRONT
Street number
71
Street type
ST
street_direction
W
Work
Other(MS)
Street (from open data)
71 FRONT ST

Not a municipal ward number.

Permit rows reflect datasets published through the City's open data program (typically via CKAN), loaded into this app's database. They are not a live feed from City permit counters.

open.toronto.ca dataset ↗