430 PASSMORE AVE
FS - Sprinkler Shop Drawing - PROVIDING ONE BEAM UNDER EXISTING FLOOR JOIST,EXTENTING EXISTING FIRE SPRINKLERLEGALIZING EXISTING MEZZ. FLOOR. MAINTAIN EXISTING WAREHOUSE USE.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
FS - Sprinkler Shop Drawing - PROVIDING ONE BEAM UNDER EXISTING FLOOR JOIST,EXTENTING EXISTING FIRE SPRINKLERLEGALIZING EXISTING MEZZ. FLOOR. MAINTAIN EXISTING WAREHOUSE USE.
Proposed alterations to add a walk-in cooler and freezer.
HVAC - Proposed alterations to add a walk-in cooler and freezer.
Proposal to replace 1 RP backflow preventer.
HVAC - Proposal to install a 3800 cfm dust collection system servicing grinding machines for thermal plastic parts
Proposal to install a 3800 cfm dust collection system servicing grinding machines for thermal plastic parts
Proposal to construct three new industrial/warehouse (Buildings A, B, and C) on an existing vacant lot.Building A - four storey industrial condo; Building B - one storey industrial condo; Building …
Plumbing - INTERIOR RENOVATION, CONSTRUCTION OF B.F.WASH ROOM,EXTENSTION OF EXISTING FIRE SPRINKLER UNDER THE EXISTING MEZZANINE FLOOR, PROVIDING ONE BEAM UNDER EXISTING FLOOR JOIST, INSTALLING FIR…
HVAC - INTERIOR RENOVATION, CONSTRUCTION OF B.F.WASH ROOM,EXTENSTION OF EXISTING FIRE SPRINKLER UNDER THE EXISTING MEZZANINE FLOOR, PROVIDING ONE BEAM UNDER EXISTING FLOOR JOIST, INSTALLING FIRE AL…
PROVIDING ONE BEAM UNDER EXISTING FLOOR JOIST,EXTENTING EXISTING FIRE SPRINKLERLEGALIZING EXISTING MEZZ. FLOOR. MAINTAIN EXISTING WAREHOUSE USE.
HVAC - Interior Fit-up for a recreational activity room. New walls,doors and plumbing fixtures.
Plumbing - Interior Fit-up for a recreational activity room. New walls,doors and plumbing fixtures.
Interior Fit-up for a recreational activity room. New walls,doors and plumbing fixtures.
Revision #2: 2 new RTUs added. Changes to the proposal.REV #1-REVISE LAYOUTPlumbing - Two storey industrial building - Passmore Business Park - Building C (SHELL ONLY)
Revision #2: 2 new RTUs addedRevision#1: 1. Mechanical and Plumbing (rev. 4)2. Add Public Washrooms (rev.4,7,11)3. Revised HVAC Plans and Electrical Plans (rev. 7)4. Revised Architectural Sets (rev…
Revision 01 - - Proposed changes on main, second levels and roof.Plumbing - Two storey office building - Passmore Business Park - Building B (SHELL ONLY)
Revision 02 - Proposed changes on main, second levels and roof.1. Mechanical and Plumbing (rev. 4)2. Add Public Washrooms (rev.4,7,11)3. Revised HVAC Plans and Electrical Plans (rev. 7)4. Revised A…
REV01: plumbing related revisionsPlumbing - one storey industrial building - Passmore Business Park - Building D (SHELL ONLY)
REV01: Plumbing related revisionPlumbing - one storey industrial building - Passmore Business Park - Building E (SHELL ONLY)
REV01: Change in building elevation (footprint to remain the same)one storey industrial building - Passmore Business Park - Building E (SHELL ONLY)
Page numbers are hidden until the total count is available from the data service.