Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
3 Ground Sign***CAMH***
3 Ground Sign*****CAMH*****
Proposed interior alterations. Scope of work includes wall removal and structural alterations including installation of new structural beam, steel posts and concrete footings as per structural draw…
HVAC - Proposal for interior alterations and underpinning and proposed two walk out stairs, front and rear.
Plumbing - Proposal for interior alterations and underpinning and proposed two walk out stairs, front and rear.
Drain - Proposal for interior alterations and underpinning and proposed two walk out stairs, front and rear.
Proposal for interior alterations and underpinning and proposed two walk out stairs, front and rear.
Drain - Proposal for interior alterations and underpinning
HVAC - Proposal for interior alterations and underpinning
Plumbing - Proposal for interior alterations and underpinning
Proposal for interior alterations and underpinning and proposed two walk out stairs, front and rear
The purpose of this project is to replace the existing light autoclaved aerated concrete (aac) siporex deck at roof E1 with new steel deck. The existing roof assembly at the roof shall also be repl…
enclosing existing skylight with new standing seam roof system and structural walkway upgrades in attic
Proposed closing two unused skylights
Proposal interior alterations first floor: 17.19sqm second floor: 52.21sqm.
Plumbing - Proposal interior alterations first floor: 17.19sqm second floor: 52.21sqm.
Drain, backwater valve and sump pump - removal and relocation of some existing walls on main and second floor. Replacing lathe and plaster with drywall. New finishes and fixtures throughout.
HVAC - removal and relocation of some existing walls on main and second floor. Replacing latheand plaster with drywall. New finishes and fixtures throughout.
HVAC - Interior alterations(179.78m²), proposed first & third floor additions(14.07m²), underpinning (42.76LM), rebuild front verandah roof with deck above, rear wood deck at first floor & rebuild …
Page numbers are hidden until the total count is available from the data service.