100 LESMILL RD
REV01: THE RECEPTION AND NEW STORAGE AREA PERMIT TO NOW INCLUDE AN EXTERIOR VESTIBULE FOR THE EXISTING TRAINING ROOM EXTERIOR DOOR. REMOVE EXSITING EXTERIOR DOOR AND INSTALL NEW. CREATE NEW EXTERIO…
Showing first 20 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV01: THE RECEPTION AND NEW STORAGE AREA PERMIT TO NOW INCLUDE AN EXTERIOR VESTIBULE FOR THE EXISTING TRAINING ROOM EXTERIOR DOOR. REMOVE EXSITING EXTERIOR DOOR AND INSTALL NEW. CREATE NEW EXTERIO…
REV01: THE RECEPTION AND NEW STORAGE AREA PERMIT TO NOW INCLUDE AN EXTERIOR VESTIBULE FOR THE EXISTING TRAINING ROOM EXTERIOR DOOR. REMOVE EXSITING EXTERIOR DOOR AND INSTALL NEW. CREATE NEW EXTERIO…
Proposal for interior alterations to existing office space, work includes new door and new corridor to the outside from the main floor corridor, adding a wellness room within this corridor. Redesig…
HVAC - Proposal for interior alterations to existing office space, work includes new door and new corridor to the outside from the main floor corridor, adding a wellness room within this corridor. …
REV03: Revision to include sprinkler layout. Revision to layout and addition of wall type.
Revision to layout and addition of wall type.
Revision to the training room to now include meeting rooms on the ground floor which includes demo of the existing walls and new meeting rooms. Construct interior alteratons (399.2m2) for OPSEU
Revision to the training room to now include meeting rooms on the ground floor which includes demo of the existing walls and new meeting rooms. Construct interior alteratons (399.2m2) for OPSEU
Replace and relocate Fire alarm panel with FX2000
Construct interior alteratons (399.2m2) for OPSEU
Plumbing - Construct interior alteratons (399.2m2) for OPSEU
HVAC - Construct interior alteratons (399.2m2) for OPSEU
Revision #1 - washroom fixturesPlumbing - Additional offices to second floor of existing buildingGround floor addition
Revision #1 - Alterations to partition walls, mechanical and plumbing workAdditional offices to second floor of existing buildingGround floor addition
Revision #1 - changes to the shape HVAC - Additional offices to existing building
Plumbing - Additional offices to second floor of existing buildingGround floor addition
HVAC - Additional offices to existing building
Additional offices to second floor of existing buildingGround floor addition
Auditorium Renovation: Removal of poured concrete tiered seating. Addition of storage room and storage mezzanine.
HVAC - Auditorium Renovation: Removal of poured concrete tiered seating. Addition of storage room and storage mezzanine.
Updated Nov 18, 2026