100 LOMBARD ST
Installation of a spraybooth requires wall penetration from the unit to the exterior with ventilation ducting attached to the exterior wall up to the roof.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Installation of a spraybooth requires wall penetration from the unit to the exterior with ventilation ducting attached to the exterior wall up to the roof.
HVAC - Installation of a spraybooth requires wall penetration from the unit to the exterior with ventilation ducting attached to the exterior wall up to the roof.
Revision to - addition of a new wall separating corridor from work room. Office renovation in suite 404. no change of use. no change of area. Proposal for a office renovation in suite 404.
Revision to - addition of a new wall separating corridor from work room. Office renovation in suite 404. no change of use. no change of area. HVAC - Proposal for a office renovation in suite 404.
Revision to - remove millwork wall and adjust M+E accordingly. Office renovation in suite 400. no change of area. no change of use. Proposal for a office renovation to suite 400.
Proposed replacement of fire alarm control panel, all zoning and wiring to remain the same.
HVAC - Proposal for a office renovation to suite 400.
Proposal for a office renovation in suite 404.
HVAC - Proposal for a office renovation in suite 404.
Proposal for a office renovation to suite 400.
Proposal for interior alterations for a new universal washroom on the 4th floor level. The scope also includes work at the roof level for new mech. equipment (duct work).
Plumbing - Interior alterations - 4th floor - New Universal Washroom
HVAC - Interior alterations - 4th floor - New Universal Washroom
New rooftop make-up air unit to provide ventilation air to existing building
HVAC - New rooftop make-up air unit to provide ventilation air to existing building
Proposed interior alterations for Suite 302.
Provide new sprinkler system to suite 205
Proposed interior alterations to existing office sutie #205 in existing mulitple tenant office. Scope includes demolition of non-load bearing walls.
Interior alterations to suite 201
Install new sprinklers in unit 202.
Page numbers are hidden until the total count is available from the data service.