100 METROPOLITAN RD
This alternative solution proposal is being submitted to determine if the City of Toronto will permit the use of FM Global design standards to protect the AutoStore System where NFPA 13 is silent.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
This alternative solution proposal is being submitted to determine if the City of Toronto will permit the use of FM Global design standards to protect the AutoStore System where NFPA 13 is silent.
Alterative solution proposal is being submitted to determine if the City of Toronto will permit the use of FM Global design standards to protect hanging garment storage where NFPA 13 is silent
Interior alteration for replacement of existing storage system to new shelf and rack system.
Interior alteration to accomodate Automated storage system within an existing warehouse space. No exterior work, no change of use, exiting or occupant load.New Roof top unit added along with struct…
HVAC - Interior alteration to accomodate Automated storage system within an existing warehouse space. No exterior work, no change of use, exiting or occupant load.New Roof top unit added along with…
Interior construction for adding mezzanine level in current 48" high ceiling warehouse - Hudson Bay Warehouse, Scope of work mechanical and electrical, sprinklers
HVAC - Interior construction for adding mezzanine level in current 48" high ceiling warehouse - Hudson Bay Warehouse, Scope of work mechanical and electrical, sprinklers
Alternative Solution proposal is being submitted to determine if the City of Toronto will permit the use of FM Global design standards to protect hanging garment storage where NFPA 13 is silent.
upgrade sprinkler system
Plumbing - Proposal for interior alterations "Hudson's Bay Company"
Proposal for interior alterations "Hudson's Bay Company"
HVAC - Proposal for interior alterations "Hudson's Bay Company"
FS - Sprinkler Shop Drawing - Proposed interior alterations in building 4 south east corner for cafeteria.
HVAC - Proposed interior alterations in building 4 south east corner for cafeteria.
Plumbing - Proposed interior alterations in building 4 south east corner for cafeteria.
Proposed interior alterations in building 4 south east corner for cafeteria.
Fire alarm to 1 building, areas 2 -6 and 1storey
FS - Sprinkler Shop Drawing - interior alterations to create employee break room, w/c, enlarge doors
HVAC - interior alterations to create employee break room, w/c, enlarge doors
interior alterations to create employee break room, w/c, enlarge doors
Page numbers are hidden until the total count is available from the data service.