100 QUEEN'S PARK
2 ground sign, one wall sign and one overhanging structure sign***ROYAL ONTARIO MUSEUM***
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
2 ground sign, one wall sign and one overhanging structure sign***ROYAL ONTARIO MUSEUM***
FS - Sprinkler Shop Drawing - To renovate the interior central atrium space of the ROM. Scope includes new skylight, feature stair, gallery wall openings, and new level raised floor.
Plumbing - To renovate the interior central atrium space of the ROM. Scope includes new skylight, feature stair, gallery wall openings, and new level raised floor.
To renovate the interior central atrium space of the ROM. Scope includes new skylight, feature stair, gallery wall openings, and new level raised floor.
HVAC - To renovate the interior central atrium space of the ROM. Scope includes new skylight, feature stair, gallery wall openings, and new level raised floor.
Proposal to remove and reinstall fire protection at infill portion at ROM. (Before the bridge at 90 Queen's Park (Which is connected to 100 QP) is demolished)
rEV 03 - Modifcations to the HVAC and plumbing distribution. Minor update to the duct work to add an access door for exhaust duct work. Deletion of fire damper supply and install scope at the B1 le…
Rev 02 - Modifcations to the HVAC and plumbing distribution. Minor update to the duct work to add an access door for exhaust duct work. Deletion of fire damper supply and install scope at the B1 le…
Proposed infill portion of south wall - facade retrofit after demolishing planetarium (including connection between both planetarium and museum)
Alternative Solution for the proposed wood ceiling for the proposed renovations to the Royal Ontario Museum (ROM), related to permit #23_166554_BLD.
Revision 01 - modifcations to the HVAC and plumbing distribution. Minor update to the configuration of the below grade Pump Rm. Plumbing - Interior and Exterior renovations to the Royal Ontario Mus…
Revision # 2 modifcations to the HVAC and plumbing distribution. Minor update to the configuration of the below grade Pump Rm. REVISION - as per the bubbled drawingsHVAC - Interior and Exterior ren…
REVISION #4 - modifcations to the HVAC and plumbing distribution. Minor update to the configuration of the below grade Pump Rm. REVISION #3- as per the bubbled drawingsInterior renovations to the R…
REVISION 01: This permit permit is being submitted to remove the crossing out for the exterior work related to the permit. Drain - Interior and Exterior renovations to the Royal Ontario Museum rela…
REVISION #3- as per the bubbled drawingsInterior renovations to the Royal Ontario Museum related to the Bloor Street entrance.
Proposal for an alternative solution to permit the use "street level entrance storey" in lieu of "first storey".
REVISION - as per the bubbled drawingsHVAC - Interior and Exterior renovations to the Royal Ontario Museum. Renovations largely focus on the 2007 Crystal addition. Minor alteration to the 1933 ROM …
Revision 01: changes listed in cover letterHVAC - Proposal for interior alteration to existing building for on-site alcohol storage collection laboratory
Revision #2 - construction of the canopy along the Bloor St W frontage which was crossed off the Revision 01 drawings - Royal Ontario Museum
HVAC - Proposed addition of the boiler and electrical room on the existing mechanical penthouse level. Relocation of roof drains and addition of new floor drains in the new boiler room.
Page numbers are hidden until the total count is available from the data service.