Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal for interior alteration/renovation to combine the existing units CRU #3b and Cru #4 into a single tenanted unit for a new Dental Office, Occupancy - "D
Plumbing - Proposal for interior alterations for a dental office
install 2 first party signs**Fika Canabis**
Install2 first party wall signs**Fika Cannabis**
Application for a permit to erect and display one illuminated wall sign.*****FARM BOY*****
Application for a permit to erect and display one illuminated wall sign.*****FARM BOY*****
Installation of one 30'x40' frame tent anchored with concrete weights at Canadian Tire. Installation will begin on May 28th, 2023 and removal will begin the end of day on May 28th, 2023 - Influence…
Rev 01 - Increased occupant loadProposed interior alterations to Unit 1 for "Club Pilates Fitness Gym"
To erect and display one illuminated wall sign, displaying static copy at the 1st storey on the northwest elevation, with a face measuring 0.69m vertically by 3.92m horizontally at the height of 5.…
REV 02: change in layoutRevision 01. HVAC - Tenant fit up of a new cannabis store, Fika Herbal Goods
REV 02: change in layoutRevision 01. Plumbing - Tenant fit up of a new cannabis store, Fika Herbal Goods
REV 02: change in layoutRevision 01. Adjusted floor plan, new fixtures/finishes.General revisions to accommodate new floor plan.Tenant fit up of a new cannabis store, Fika Herbal Goods
Plumbing - Proposed interior alterations to Unit 1 for "Club Pilates Fitness Gym"
Proposed interior alterations to Unit 1 for "Club Pilates Fitness Gym"
HVAC - Proposed interior alterations to Unit 1 for "Club Pilates Fitness Gym"
To erect and display six illuminated wall signs, displaying static copy, each with one sign face measuring 1.22m vertically by 1.36m horizontally, at the height of 5.79m. The signs are located as f…
Revision 01. Plumbing - Tenant fit up of a new cannabis store, Fika Herbal Goods
Revision 01. Adjusted floor plan, new fixtures/finishes.General revisions to accommodate new floor plan.Tenant fit up of a new cannabis store, Fika Herbal Goods
Plumbing - Tenant fit up of a new cannabis store, Fika Herbal Goods
Page numbers are hidden until the total count is available from the data service.