Showing first 10 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Rev 03 - Front canopy framing reviewed by structural engineer. Architectural drawings updated to reflect framing completed by prior contractor. Structural engineer issued letter to verify beam size…
REV02: changes to layout
REV 02 - Changes to second storey with alterations to the staircase.REV 01 - Changes to layout and design (designer change).Proposal to construct a second floor front and rear addition, new rear de…
Revision #01 - Changes to layout and design (Designer change.)Proposal to construct second floor front and rear addition, new rear deck and interior alterations.
Revision #01 - Changes to layout and design (Designer change.)Plumbing - Proposal to construct second floor front and rear addition, new rear deck and interior alterations.
Revision #01 - Changes to layout and design (Designer change.)HVAC - Proposal to construct second floor front and rear addition, new rear deck and interior alterations.
HVAC - Proposal to construct second floor front and rear addition, new rear deck and interior alterations.
Proposal to construct second floor front and rear addition, new rear deck and interior alterations.
Plumbing - Proposal to construct second floor front and rear addition, new rear deck and interior alterations.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.