105 CAMPBELL AVE
Plumbing - Proposed 3 storey rear addition on existing rear concrete porch / new 3rd floor addition / new basement walkout / proposed 3rd suite
Showing first 11 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Plumbing - Proposed 3 storey rear addition on existing rear concrete porch / new 3rd floor addition / new basement walkout / proposed 3rd suite
HVAC - Proposed 3 storey rear addition on existing rear concrete porch / new 3rd floor addition / new basement walkout / proposed 3rd suite
REVISION - revised 2nd and 3rd floorsProposed 3 storey rear addition on existing rear concrete porch / new 3rd floor addition / new basement walkout / proposed 3rd suite
Proposed 3 storey rear addition on existing rear concrete porch / new 3rd floor addition / new basement walkout / proposed 3rd suite
Proposed two storey rear addition on existing rear concrete porch and reconstruction of basement walkout.
Revision #01 - Changes interior layuout and to concrete porch in the rear yard.Interior alterations to create a second unit in basement
To reconstruct rear basement walkout
Revision 01: new hvac designer/design
HVAC - Interior alterations to create a second unit in basement
Interior alterations to create a second unit in basement
Plumbing - Interior alterations to create a second unit in basement
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.