105 ST GEORGE ST
Proposed Fire alarm panel replacement and system upgrade including replacement of initiating devices.
Showing first 18 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposed Fire alarm panel replacement and system upgrade including replacement of initiating devices.
Proposed Fire alarm panel replacement and system upgrade including replacement of initiating devices.
HVAC - Interior alterations to offices 323, 323A, 325 and 327 at 3rd floor
Proposal for interior alterations to the existing administration offices 323, 323A, 325 & 327 located on a portion of the 3rd floor level at the existing University - 'U of T Rotman School of Manag…
Proposed interior alterations to administrative offices
HVAC - Proposed interior alterations to administrative offices
Proposal for interior alterations to 2 suites in an existing student residence - UNITS 106 & 306, Innis College Residence, U of T.Convenience address is 111 St George St.
To erect and display four (4) non illuminated wall sign.****ROTMAN***
HVAC - Proposed to construct small rooms on 4th and 5th floor complete with separate temperature controls.
Proposed to construct small rooms on 4th and 5th floor complete with separate temperature controls.
Proposal to install a new fire alarm system.
Standalone permit to revise a portion of the existing HVAC system on the 5th floor. Ductwork, diffusers, VAVs, and thermostats will be added/relocated to accommodate new office configuration.
Proposal for localized interior rehabilitation to existing parking garage for University of Toronto.
HVAC - Interior alterations - U of T Rottman Second Floor
Interior alterations - U of T Rotman Second Floor
FS - Sprinkler Shop Drawing - Proposal for interior alterations to offices and lounge space to convert to computer / trading lab on the second floor of existing building
HVAC - Proposal for interior alterations to offices and lounge space to convert to computer / trading lab on the second floor of existing building
To provide and install sprinklers in 4th and 5th floors.
End of list for these filters.
Updated Nov 17, 2026