1100 SPADINA RD
Plumbing - EXCAVATION AND THE APPLICATION OF WATERPROOFING ALONG THE BUILDING'S FOUNDATION WALLS. ENGINEERING AND INSTALLATION OF TEMPORARY AND PERMANENT SHORING REQUIRED TO EXECUTE WORK. INSTALLAT…
Showing first 9 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Plumbing - EXCAVATION AND THE APPLICATION OF WATERPROOFING ALONG THE BUILDING'S FOUNDATION WALLS. ENGINEERING AND INSTALLATION OF TEMPORARY AND PERMANENT SHORING REQUIRED TO EXECUTE WORK. INSTALLAT…
EXCAVATION AND THE APPLICATION OF WATERPROOFING ALONG THE BUILDING'S FOUNDATION WALLS. ENGINEERING AND INSTALLATION OF TEMPORARY AND PERMANENT SHORING REQUIRED TO EXECUTE WORK. INSTALLATION OF NEW …
Drain - EXCAVATION AND THE APPLICATION OF WATERPROOFING ALONG THE BUILDING'S FOUNDATION WALLS. ENGINEERING AND INSTALLATION OF TEMPORARY AND PERMANENT SHORING REQUIRED TO EXECUTE WORK. INSTALLATION…
Reinforce concrete slab above existing bunker, remove part of existing concrete wall
Proposal to upgrade the fire alarm control panel
Fire alarm control panel upgrade
Proposal to relocate 1 portable classroom at North Preparatory Public School
Proposal to install one backflow preventor in existing school - "North Prep Jr Public School"
Replace boiler
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.