1109 BATHURST ST
REV 03 - Revision for electromagnetic locks, request to exit sensor, card reader access and manual pull stations provided on door, D101B, From drive thru to office. REV 02 - Revision to Delete 600 …
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV 03 - Revision for electromagnetic locks, request to exit sensor, card reader access and manual pull stations provided on door, D101B, From drive thru to office. REV 02 - Revision to Delete 600 …
REV 02: MECHANICAL REVISIONS AT GROUND FLOOR LEVEL (Note: Revision to Permit #02 was for 4th floor office; Revision to Permit #01 was for Maglocks)REV 01 - To match BLD revisionHVAC - To construct …
Install 2 first party wall signs
REV 01 - Revision to reflect BLD RevisionPlumbing - To construct a new eight storey self-storage building
REV 02 - Revision to Delete 600 Sqft of self storage on 4th floor and add 600 sqft of ancillary office space incl B-F Washroom on 4th floorRev 01 - REVISION FOR MAGLOCK PERMIT. ELECTROMAGNETIC LOCK…
REV 01 - To match BLD revisionHVAC - To construct a new eight storey self-storage building
Rev 01 - REVISION FOR MAGLOCK PERMIT. ELECTROMAGNETIC LOCKS, FAILSAFE TRIMS AND MANUAL PULL STATIONS PROVIDED ON STAIR DOORS FOR FLOOR RE-ENTRY AT THIRD AND SIXTH FLOORS [CROSSOVER FLOORS]. To cons…
Conditional Permit - Drain - To construct a new eight storey self-storage building
Part Permit - To construct a new eight storey self-storage building
This Folder was closed by the system. PP child folders cannot be created using the 'Create Child' button.The n_ParentRSN was: 5257433
This Folder was closed by the system. PP child folders cannot be created using the 'Create Child' button.The n_ParentRSN was: 5257433
Revision STANDALONE SHORING AND EXCAVATION FOR REMEDIATION PURPOSES.
Alternative Solution for the proposed development at 1109 Bathurst Street will be provided with a standpipe system. 65 mm fire hose valve connections will be located within the exit stairs at the m…
HVAC - To construct a new eight storey self-storage building
To construct a new eight storey self-storage building
Drain - To construct a new eight storey self-storage building
Plumbing - To construct a new eight storey self-storage building
STANDALONE SHORING AND EXCAVATION FOR REMEDIATION PURPOSES.
To demolish existing car wash building for future development (SA 20-159926)
This is for the installation of a 1 1/2" R.P backflow prevention device installed in the machine room on the ground floor of this car wash establishment. This is known as "Bathurst Carwash" and it …
Page numbers are hidden until the total count is available from the data service.