111 LOMBARD ST
Proposal for garage roof slab Expansion Joint Replacement and Localized Concrete Repairs.
Showing first 11 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal for garage roof slab Expansion Joint Replacement and Localized Concrete Repairs.
Installation of new maglock at CACF room.
In conjunction with a hotel "Holiday Inn Express" located on the premises, proposal to erect and display one illuminated projecting sign, containing static copy, located on the east facing first st…
REV - 01 - revision to include the work on the 1st floor of the building.lumbing - Proposal to the construct a front addition to the vestibule and for interior alterations to floors 1-16 to have ne…
REV - 01 - revision to include the work on the 1st floor of the building.HVAC - Proposal to the construct a front addition to the vestibule and for interior alterations to floors 1-16 to have new w…
REV - 01 - revision to include the work on the 1st floor of the building. Also for alterations to P1 level.Proposal for interior alterations to floors 2-16 to have new washroom fixtures and finishe…
FS - Sprinkler Shop Drawing - Proposal to the construct a front addition to the vestibule and for interior alterations to floors 1-16 to have new washroom fixtures and finishes, barrier free room w…
Proposal for interior alterations to floors 2-16 to have new washroom fixtures and finishes, barrier free room washrooms, fitness room on the 2nd floor and new laundry room on the 4th floor.
HVAC - Proposal to the construct a front addition to the vestibule and for interior alterations to floors 1-16 to have new washroom fixtures and finishes, barrier free room washrooms, fitness room …
Plumbing - Proposal to the construct a front addition to the vestibule and for interior alterations to floors 1-16 to have new washroom fixtures and finishes, barrier free room washrooms, fitness r…
Proposal for localized concrete repair, waterproofing and mastic repairs to levels P1 and P2 of the existing hotel.
End of list for these filters.
Updated Nov 17, 2026