112 GARDENVIEW CRES
Revision to include the attic space.HVAC - Proposal to convert attic space to habitable dwelling space for the existing unit 2. The existing second suite was approved under 02-130639 BLD rev 04.
Showing first 17 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision to include the attic space.HVAC - Proposal to convert attic space to habitable dwelling space for the existing unit 2. The existing second suite was approved under 02-130639 BLD rev 04.
HVAC - Proposal to convert attic space to habitable dwelling space for the existing unit 2. The existing second suite was approved under 02-130639 BLD rev 04.
Rev 01: Revision to stairsOrig: Proposal to convert attic space to habitable dwelling space for the existing unit 2. The existing second suite was approved under 02-130639 BLD rev 04.
Plumbing - Proposal to convert attic space to habitable dwelling space.
Proposal to convert attic space to habitable dwelling space for the existing unit 2. The existing second suite was approved under 02-130639 BLD rev 04.
interior alterations to existing attic space
Plumbing - interior alterations to existing attic space
Plumbing -THIS REVISON #2 IS TO CREATE BASEMENT APARTMENT FOR REVISION #4 BUILDING PERMIT **Revision 01- To show first floor washroom. 2 STOREY REAR ADDITION - Addition(s) 3 PIECE WASHROOM
REVISION 4 - CREATE A SECOND UNIT IN BASEMENT and to revise existing portion of the roof and basement window (front of the dwelling)
HVAC Revision 01- Revised HVAC layout.2 STOREY REAR ADDITION - Addition(s)
REVISION 03 re; to revise an existing portion of the roof and basement window.REVISION 02: To alter roof slope to allow installation of solar roof panels. ( two storey rear addition).
Plumbing - **Revision 01- To show first floor washroom. 2 STOREY REAR ADDITION - Addition(s) 3 PIECE WASHROOM
REVISION 02: To alter roof slope to allow installation of solar roof panels. ( two storey rear addition).
REVISION: Changes to 2nd floor, flat to sloped roof with an attic space, changes to first floor to create 1 bedroom from 2
HVAC - 2 STOREY REAR ADDITION - Addition(s)
Plumbing - 2 STOREY REAR ADDITION - Addition(s) 3 PIECE WASHROOM
2 STOREY REAR ADDITION
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.