HVAC - Proposal for th reconfiguration of washroom layout within Transit Control Room to increase the number of fixtures.
Plumbing - Proposal for th reconfiguration of washroom layout within Transit Control Room to increase the number of fixtures.
Proposal changed to the washrooms remain as they are and converting a janitor's closet to a universal washroom to the building, the email is attached to the examiner's processProposal for the recon…
Proposal to provide cold water supply to parts washer complete with a backflow preventer - Harvey Shop
Provide cold water supply to parts washer complete with a backflow preventer - Harvey Shop
Plumbing - Modification to Hillcrest Streetcar Maintenance and Storage Facility to accommodate the new LFLRV streetcars, this includes:1. Modification to Hillcrest Yard track layout and OCS (Overhe…
Modification to Hillcrest Streetcar Maintenance and Storage Facility to accommodate the new LFLRV streetcars, this includes:1. Modification to Hillcrest Yard track layout and OCS (Overhead Catenary…
Drain - Modification to Hillcrest Streetcar Maintenance and Storage Facility to accommodate the new LFLRV streetcars, this includes:1. Modification to Hillcrest Yard track layout and OCS (Overhead …
HVAC - Modification to Hillcrest Streetcar Maintenance and Storage Facility to accommodate the new LFLRV streetcars, this includes:1. Modification to Hillcrest Yard track layout and OCS (Overhead C…
Provide cold water supply to parts washer complete with a backflow preventer - Harvey Shop - Vehicle Repair
Revision 01 - addition to fire/heat detectors and connection of elevator to FA panel as per bubbled areasPassenger elevator overhaul in existing building. Scope includes: Addition of fire/heat dete…
HVAC - Replacement of 29 bus hoists in the pits and associated controls/plumbings and drainage
Plumbing - Replacement of 29 bus hoists in the pits and associated controls/plumbings and drainage
Drain - Replacement of 29 bus hoists in the pits and associated controls/plumbings and drainage
Replacement of 29 bus hoists in the pits and associated controls/plumbings and drainage
Plumbing - Proposal to remove existing paint booth and install powder coating paint booth, curing oven, and cooling tunnel, scope of work includes plumbing, electrical, mechanical and structural co…
HVAC - Proposal to remove existing paint booth and install powder coating paint booth, curing oven, and cooling tunnel, scope of work includes plumbing, electrical, mechanical and structural compon…
Proposal to remove existing paint booth and install powder coating paint booth, curing oven, and cooling tunnel, scope of work includes plumbing, electrical, mechanical and structural components.
Revision 01 - addition to fire/heat detectors and connection of elevator to FA panel as per bubbled areasPassenger elevator overhaul in existing building. Scope includes: Addition of fire/heat dete…