116 MANOR RD E
Revision 01: Added sprinkler in the furnace room as per inspectors instructions, revised the basement ceiling assembly.PROPOSED INTERIOR ALTERATION, AND FINISHED BASEMENT APARTMENT TO AN EXISTING T…
Showing first 12 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 01: Added sprinkler in the furnace room as per inspectors instructions, revised the basement ceiling assembly.PROPOSED INTERIOR ALTERATION, AND FINISHED BASEMENT APARTMENT TO AN EXISTING T…
HVAC - PROPOSED INTERIOR ALTERATION, AND FINISHED BASEMENT APARTMENT TO AN EXISTING TWO STOREY DWELLING
Plumbing - PROPOSED INTERIOR ALTERATION, AND FINISHED BASEMENT APARTMENT TO AN EXISTING TWO STOREY DWELLING
PROPOSED INTERIOR ALTERATION, AND FINISHED BASEMENT APARTMENT TO AN EXISTING TWO STOREY DWELLING
Plumbing - PROPOSED INTERIOR ALTERATION, AND FINISHED BASEMENT APARTMENT TO AN EXISTING TWO STOREY DWELLING
PROPOSED INTERIOR ALTERATION, AND FINISHED BASEMENT APARTMENT TO AN EXISTING TWO STOREY DWELLING
Convert the existing basement to a secondary dwelling unit, repair and alter existing rear deck
Drain - Convert the existing basement to a secondary dwelling unit, repair and alter existing rear deck
Plumbing - Convert the existing basement to a secondary dwelling unit, repair and alter existing rear deck
Plumbing - proposal for new secondary basement suite through interior alterations.
Proposal for new secondary basement suite through interior alterations.Proposed/Replace Deck
Drain - proposal for new secondary basement suite through interior alterations.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.