1180 EGLINTON AVE E
Alternative solution - per sentence 3.13.5.4.(1) of OBC, each rapid transit station must be "monitored" by a central supervising station (CSS) conforming to CAN/ULC-S561. Based on the definition of…
Showing first 9 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Alternative solution - per sentence 3.13.5.4.(1) of OBC, each rapid transit station must be "monitored" by a central supervising station (CSS) conforming to CAN/ULC-S561. Based on the definition of…
Protection of Standpipe Systems at all Stations
Revision 02 - addition of platform edge bollards. Refer to typical design approvals in ADS 22 193328, 22 200930, 22 216439 and 22 216647Revision 01 - Bus terminal property line revision: refer to a…
installation of the future Presto Faregates to the transit subway station that has received occupany permit 22 191657 000 00 AO - Science centre
Require the installation of bollard barriers
Revision 01 - Bus terminal property line revision: refer to attached spreadsheet for all list of revisions. Include Alternative Solution 19-259678 ALTConstruction of the Science Centre Station of t…
FS - Sprinkler Shop Drawing - Construction of the Science Centre Station of the Eglinton Crosstown LRT
Plumbing - Construction of the Science Centre Station of the Eglinton Crosstown LRT
HVAC - Construction of the Science Centre Station of the Eglinton Crosstown LRT
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.