122 ARROW RD
REV 01: Removal of ceiling & relocation of siamese connection.Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV 01: Removal of ceiling & relocation of siamese connection.Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material.
Proposal for an alternative solution to omit the standpipe system
Fire protection
A TIMED EGRESS ANALYSIS HAS BEEN COMPLETED BASED ON THE SFPE HANDBOOK OF FIRE PROTECTION ENGINEERING, 5TH EDITION, CHAPTER 59, ¿EMPLOYING THE HYDRAULIC MODEL IN ASSESSING EMERGENCY MOVEMENT¿ TO COM…
Drain - Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material.
Plumbing - Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material.
HVAC - Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material.
A TIMED EGRESS ANALYSIS HAS BEEN COMPLETED BASED ON THE SFPE HANDBOOK OF FIRE PROTECTION ENGINEERING, 5TH EDITION, CHAPTER 59, EMPLOYING THE HYDRAULIC MODEL IN ASSESSING EMERGENCY MOVEMENT , TO COM…
Part Permit - Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material.
Part Permit - Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material.
Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material.
Proposal to install 1 temporary certified tent, 30' X 40' (#14-251051) in the parking lot of an existing industrial building from July 2, 2015 to July 3, 2015 - PAN AM - Canadian FibresConvenience …
Proposed installation of additional ductwork for existing manufacturing equipment on roof of (1) storey industrial building "Bemis Flexible Packaging" and provide structural support.
Replace (10) existing stacks on roof of (1) storey industrial building *Bemis Flexible Packaging* and provide structural supports.
Install one electromagnetic lock on door to roof stair on existing industrial building.
HVAC - Interior alterations to an existing industrial facility to create an ink storage room with explosion relief. - Interior Alterations
Interior alterations to an existing industrial facility to create an ink storage room with explosion relief.
HVAC - Sept 15/03 - Zoning Approved - ljTo construct a storage platform - Interior Alterations
4" OVERFLOW TO SANITARY FROM WATER PIT, 3 EYE WASH STATIONS AND 1 SINK
Installation of Sprinkler System in a new Maintenance Shop. Including Mezzanianne.
Page numbers are hidden until the total count is available from the data service.