Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 02 - Revision to include Sprinkler & standpipe alterations-------------------------------------------------------------------------REVISION#1: Revision to partition, fixture and ceiling la…
REVISION#1: Revision to partition, fixture and ceiling layout.__________________________________________________Proposed interior alterations to existing retail suite, unit 2-102, Shoppers Drug Mart.
HVAC - Revision to ductwork layout, Unit 2-102 - Shoppers Drug Mart.
Revision 01; Revision to plumbing fixture layout.Plumbing - Proposed interior alterations to existing retail suite, unit 2-102, Shoppers Drug Mart.
Proposed interior alterations to existing retail suite, unit 2-102, Shoppers Drug Mart.
HVAC - Proposed interior alterations to existing retail suite, unit 2-102, Shoppers Drug Mart.
Plumbing - Proposed interior alterations to existing retail suite, unit 2-102, Shoppers Drug Mart.
Application for a permit to erect and display two illuminated wall signs, both displaying static copy, erected at level 11th of the building. ZMP 21-178640 approved.Dimensions:TCS-1: 3.03m L x 16.5…
REVISION 2 - revision to interior alterations of commerical office space on the 9th and 10th Floor. (Staircase railing, spanning FL9 - FL10)Interior alterations of commercial office space on the 4t…
Proposal for fire/ security upgrade, office electromagnetic locks to install 2 single maglock on 9th floor.
Pre Action Sprinkler System and Standpipe alterations
Revision #01 - Add 11th floor interior fit-out to the existing permit. A significant amount of the 11th floor consists of base building Mechanical and Electrical rooms. The landlord has provided a …
Revision #01 - Add 11th floor interior fit-out to the existing permit. A significant amount of the 11th floor consists of base building Mechanical and Electrical rooms. The landlord has provided a …
Revision #01 - Add 11th floor interior fit-out to the existing permit. A significant amount of the 11th floor consists of base building Mechanical and Electrical rooms. The landlord has provided a …
Proposal to install a Novec Fire Supression system in existing office space - WWP Waterfront Innovation Centre
Fire/security upgrade, office, electormagnetic locksTo install 1 single maglock on 4th floor, 2 single maglock on 5th floor elevator lobby, 2 single maglocks on the 5th floor stairwells, 1 single m…
Proposal to erect and display two illuminated wall signs, displaying static copy at the uppermost storeys of the building. South and north elevations.***WPP TORONTO***
REV #2-CONSTRUCT DEMISING WALL FOR 2 GROUND FLOOR RETAIL UNITS 1 & 2Proposal to construct an 11 storey office building plus mechanical penthouse above, ground floor retail, and 3 levels of below gr…
HVAC - Interior alterations of commercial office space on the 4th,5th,6th,7th,9th & 10th floors and stair opening on the 10th floor.
Page numbers are hidden until the total count is available from the data service.