130 OLD KINGSTON RD
Installation of 40' x 80' archtop tent, staked into the ground at Miller Lash House, University of Toronto - Scarborough Campus. Installation date April 9, 2025. Removal date November 7, 2025.
Showing first 19 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Installation of 40' x 80' archtop tent, staked into the ground at Miller Lash House, University of Toronto - Scarborough Campus. Installation date April 9, 2025. Removal date November 7, 2025.
Installation of 40' x 80' archtop tent, staked into the ground at Miller Lash House, University of Toronto - Scarborough Campus. Installation date April 10, 2024. Removal date November 11, 2024.
Proposal for 4 separate 26' geodesic domes to be placed on top of gravel pads and surrounded by gravel pathways. The domes are largely prefabricated structures and will function similar to greenhou…
Proposal of installation of 40'x80' archtop tent, staked at Miller Lash House, University of Toronto - Scarborough Campus, Installation is proposed to begin April 30, 2023 and removal will begin on…
proposal to install four 26' geodesic domes
1 CERTIFIED TEMPORARY TENT, 40ft x 80ft Archtop Frame tent. (Cert #14 251048)ANCHORED WITH STEEL STAKES.INSTALLED - April 6th to October 15th, 2022.
Proposal to erect 1 certified temporary tent, 40' x 80' archtop frame tent (Cert# 14-251048), anchored with steel stakes. To be installed April 4th to October 15th 2020.
Proposal to erect 1 certified temporary tent, 40' x 80' archtop frame tent (Cert# 14-251048), anchored with steel stakes. To be installed April 4th to October 15th 2020.
Proposal to install 2 certified tents: 1 - 20' x 40' standard pipe frame tent (14-251050) and 1 - 15m x 30m Hoecker Rigid Frame Tent (14-251055), to be anchored with steel stakes and installed Augu…
Proposal to erect 20' x 40' certified tent (14-251050) and 15m x 30m certified tent (14-251055) on June 24th, 2019 then dismantle on June 26th, 2019.
Install 1 certified tent 40' x 80' (14-251048) anchored with steel stakes for U of T date that it is being erected; April 4th and dismantled October 15th.
Install 1 certified tent 40' x 80' (14-251048) anchored with steel stakes for U of T date that it is being erected; April 4th and dismantled October 15th.
Construction of a 20'x30' steel shade structure and water station within the boundary of existing tennis courts
Drain - Construction of a 20'x30' steel shade structure and water station within the boundary of existing tennis courts
Install 1 certified tent (14-251048) anchored with steel stakes at the Miller Lash House for U of T
1 CERTIFIED TEMPORARY TENT, 60ft x 90ft Archtop Frame tent. (Cert #14 251048) June 2nd, 2016 to June 6th, 2016.
1 CERTIFIED TEMPORARY TENT, 40ft x 80ft Archtop Frame tent. (Cert #14 251048) April 4th 2016 to October 15th, 2016.
Proposal to erect one certified tent 20ft x 40ft Std Pipe Frame Tent(Cert # 14 251050). To be erected Aug 13th dismantled Aug 17th 2015
ERECT CERTIFIED TENT AT MILLER LASH HOUSE 40 X 80 ARCHTOP FRAME TENT APR 20/15-OCT 15/15
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.