130 THE QUEENSWAY
Plumbing - The project scope includes the removal and replacement of all existing blowers and associated systems in the North and South Blower Buildings, select upgrades to the existing blower buil…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Plumbing - The project scope includes the removal and replacement of all existing blowers and associated systems in the North and South Blower Buildings, select upgrades to the existing blower buil…
HVAC - The project scope includes the removal and replacement of all existing blowers and associated systems in the North and South Blower Buildings, select upgrades to the existing blower building…
The project scope includes the removal and replacement of all existing blowers and associated systems in the North and South Blower Buildings, select upgrades to the existing blower buildings with …
REVISION 2 - pertaining to the material change for the domestic water pipingPlumbing - Interior alterations (interior and exterior stairs, new openings in exterior wall etc) and addition to existin…
Plumbing - Supply and install extension of the existing conveyor catwalk to Headhouse Loading Bay vestibule with installation of secondary egress on east side of the conveyor catwalk. Construction …
HVAC - Supply and install extension of the existing conveyor catwalk to Headhouse Loading Bay vestibule with installation of secondary egress on east side of the conveyor catwalk. Construction of a…
Supply and install extension of the existing conveyor catwalk to Headhouse Loading Bay vestibule with installation of secondary egress on east side of the conveyor catwalk. Construction of a new ve…
Revision 01. Check the attached letter for the changesHVAC - Demolition and removals, new elevator, expansion to the building, renovate main entrance, lobby, exterior ramp. Renovate 1st and 2nd flo…
Revision 01. Check the attached letter for all the changesDemolition and removals, new elevator, expansion to the building, renovate main entrance, lobby, exterior ramp. Renovate 1st and 2nd floor …
Install new fire pump and sprinkler system (related to 18 200915 BLD)
Proposal to demolish existing boiler building for installation of a new north boiler building at the humber treatment plant
Plumbing - Proposal to demolish existing boiler building and construct a new north boiler building at the Humber Treatment Plant
Proposal to demolish existing boiler building and construct a new north boiler building at the Humber Treatment Plant
HVAC - Proposal to demolish existing boiler building and construct a new north boiler building at the Humber Treatment Plant
Drain - Proposal to demolish existing boiler building and construct a new north boiler building at the Humber Treatment Plant
HVAC - Modifications to HVAC, sumps, roof and floor drains, addition of exterior staircases, and other miscellaneous plant-wide upgrades at the Humber Treatment Plant.
Modifications to HVAC, sumps, roof and floor drains, addition of exterior staircases, and other miscellaneous plant-wide upgrades at the Humber Treatment Plant.
Plumbing - Modifications to HVAC, sumps, roof and floor drains, addition of exterior staircases, and other miscellaneous plant-wide upgrades at the Humber Treatment Plant.
Revision #01 - Revised site services for temp building A and added site services for temp building B.Drain - Site services 1. Additional storm connection for the proposed building expansion 2. Stor…
Revision - Add sanitary drain pipe and domestic cold water pipe to service Temporary Building B. Plumbing - Demolition and removals, new elevator, expansion to the building, renovate main entrance,…
Page numbers are hidden until the total count is available from the data service.