139 ST GEORGE ST
Proposal for Installation of roof edge railings, roof mounted stair and ladder ports at TTC's St. George Station -St. George Entrance
Showing first 19 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal for Installation of roof edge railings, roof mounted stair and ladder ports at TTC's St. George Station -St. George Entrance
Storm pump replacement St George Subway Station
Plumbing - Storm pump replacement St George Subway Station
Drain - Storm pump replacement - St George Subway Station
Revision 01- to reflect revised piping and other layout changes required to comply with toronto water (large meter dept installation requirements at TTC's St. George Station. Installation of premis…
Installation of premise isolation (backflow prevention) for the Toronto Transit Commission'sSt. George Station.
Proposal to install a fire suppression system and a fire alarm panel.
FS - Sprinkler Shop Drawing - Proposal to demolish and construct 2 new walls, install new doors, replacement of small ventilation system using outdoor air for cooling, relocation and addition of po…
Revision 01 - Revised location of presto faregate line as per bubbled drawings.Proposal for interior alterations to existing transit station. Scope of work includes replacing legacy turnstiles with…
HVAC - Proposal to demolish and construct 2 new walls, install new doors, replacement of small ventilation system using outdoor air for cooling, relocation and addition of power receptacles and lig…
Plumbing - Proposal to demolish and construct 2 new walls, install new doors, replacement of small ventilation system using outdoor air for cooling, relocation and addition of power receptacles and…
Proposal to demolish and construct 2 new walls, install new doors, replacement of small ventilation system using outdoor air for cooling, relocation and addition of power receptacles and lighting, …
Proposal for interior alterations to existing transit station. Scope of work includes replacing legacy turnstiles with Presto faregates - St George Subway Station
Proposal for fire alarm system upgrade. Scope of work includes replacinf fire alarm panel, EOLs, detecotrs, and bells/horns.
HVAC - Interior alterations to renovate and increase occupant load from 4 to 12 in "Backup Transit Control Room" at platform level. St. George Station.
Interior alterations to renovate and increase occupant load from 4 to 12 in "Backup Transit Control Room" at platform level. St. George Station.
install new fire alarm stystem througout st. george subway station. (4 stories).
INSTALL ON MEZZANINE LEVEL: 2 W.B., 2 W.C., 1 URINAL AND 2 WASH TUB. ON LOWER PLATFORM LEVEL: 1 SCRUBER DRAIN, 1 ELEVATOR PIT, 1 SUMP PUMP AND 1 OIL INTERSEPER. AF
INSTALL FIXTURES LOWER PLATFORM 1 ELEVATOR PIT DRAIN, 1 OIL INT. UPPER PLATFORM 1 ELEV. PIT DRAIN, MEZZANINE LEVEL 2 W.B., 2 W.C. 1 URNL., 2 W.T. COST INCLUDED WITH APPL.353681 SS PLANS
End of list for these filters.