140 GRANGEWAY AVE
Conditional Permit - Part Permit - Construction of the Scarborough Centre Station for the SSE-SRS project
Showing first 9 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Conditional Permit - Part Permit - Construction of the Scarborough Centre Station for the SSE-SRS project
It is proposed to instead supply emergency power from two alternate power supplies from Toronto Hydro in lieu of one primary power supply from Toronto Hydro and a back-up generator as prescribed by…
The proposed alternative solution required for OBC Div. B 3.13.3.3 (4) - Service Rooms and Ancillary Spaces demonstrates compliance with the minimum performance level and objectives, as outlined in…
The proposed alternative solution is to extend the prescribed 15 m maximum distance from the principal building entry to the fire department access route by 5 m, to a total of 20 m.
To remove the requirement for standard prescriptive provisions (sprinkler coverage, full-height access, emergency lighting, and additional passive fire separations) within a 1 m high crawl space un…
Proposal to remove the requirement for a 1-hour fire-rated enclosure around the elevator shafts by implementing controls such as the minimization of fire loads adjacent to elevator shafts, installi…
Proposal to place the temporary site trailers in the laydown area for the proposed Scarborough Centre Station
Conditional Permit - Part Permit - Construction of the Scarborough Centre Station for the SSE-SRS project
Construction of the Scarborough Centre Station for the SSE-SRS project
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.