Showing first 19 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Rev 03: revisions to the amenity space level (Floor 7)
REVISION 02- as per the drawings changes to the fire ratings.Construction of a new 7-Storey 42 -unit residential condominium with 2 levels of underground parking.
REVISION - as per the drawingsConstruction of a new 7-Storey 42 -unit residential condominium with 2 levels of underground parking.
REVISION 2 - as per the drawiingsPlumbing - Construction of a new 42-unit condominium with 2 levels of underground parking
REVISION 2 - as per the drawingsHVAC - Construction of a new 42-unit condominium with 2 levels of underground parking
Rev 01: Revision to HVAC as per bubbled drawingsHVAC - Construction of a new 42-unit condominium with 2 levels of underground parking
Rev 01: Revision to plumbing as per bubbled drawingsPlumbing - Construction of a new 42-unit condominium with 2 levels of underground parking
FS - Sprinkler Shop Drawing - Construction of a new 7-Storey 41-unit residential condominium with 2 levels of underground parking.
install backflow device for temporary water service
Part Permit - SUPERSTRUCTUREConstruction of a new 7-Storey 41-unit residential condominium with 2 levels of underground parking.
Alternative Solution Proposed: for all floors, except for the parking levels, it is proposed to design a standpipe system in a manner that standpipe risers provided with hose connections will be lo…
Drain - Construction of a new 7-Storey 41-unit residential condominium with 2 levels of underground parking.
Conditional Permit - Part Permit - Construction of a new 7-Storey 41-unit residential condominium with 2 levels of underground parking.
Plumbing - Construction of a new 41-unit condominium with 2 levels of underground parking
Construction of a new 7-Storey 42 -unit residential condominium with 2 levels of underground parking.
HVAC - Construction of a new 41-unit condominium with 2 levels of underground parking
Drain - Construction of a new 41-unit condominium with 2 levels of underground parking
demolish 2 storey building
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.