Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 01: Proposal to revise hvacHVAC - Proposal for interior alterations over 10 floors for a new Group D office tenant (CPP) in an existing high-rise. Scope includes structural, HVAC, electric…
Proposal for 80 electromagnetic locks on 10 floors (Floors 31-40).
Revision - Added general note 9 for kitch equiment clarifying hvac design assumptions and confirming no grease vapours, fumes, smoke COC's fire alarm or migrating odours will be generated. also add…
Revision to Relocated FEVC from corridor wall 47408 to corridor wall 47405 newr breakout area. FVC distance also revised. Revised tag and combined FVC& Fe to FEVC near filling 47201Plumbing - 47th …
HVAC - Proposal for interior alteration (Fit out for multi tenant corridor- Level 48)
Proposal for interior alteration (Fit out for multi tenant corridor- Level 48)
Revision 01: Application for revision to reduce the scope of work for food and beverage area on 4th floor (in connection with permit no. 24 208250 BLD/PLB & HVA ) HVAC - Proposal for interior alter…
Revision 01: Application for revision to reduce the scope of work for food and beverage area on 4th floor (in connection with permit no. 24 208250 BLD/PLB & HVA )Plumbing - Proposal for interior al…
Revision 01: Application for revision to reduce the scope of work for food and beverage area on 4th floor (in connection with permit no. 24 208250 BLD/PLB & HVA )Proposal for interior alterations f…
Proposal to install four (4) maglocks on 46th floor.
Proposal for maglock doors on 41st floor quantity 7,42nd floor quantity 7, 43rd floor quantity 7, 44th floor quantity 8,45th floor quantity 10 and 46th floor quanity 6
Plumbing - 47th floor: Proposed new interior alterations to include new open work space, enclosed offices and meeting rooms, cafe stations
HVAC - 47th floor: Proposed new interior alterations to include new open work space, enclosed offices and meeting rooms, cafe stations
47th floor: Proposed new interior alterations to include new open work space, enclosed offices and meeting rooms, cafe stations
HVAC - Proposal for new offices for Alamos Gold Inc.
Proposal for new offices for Alamos Gold Inc.
Plumbing - Proposal for new offices for Alamos Gold Inc.
REV 03:Revision to mechanical drawing set (see attached cover letter)REV 02: Revised drawing set (refer to cover letter attached).REV 01: Revised drawing set (refer to cover letter attached).HVAC -…
REV 02:Revision to drawing set (see attached cover letter)Proposal to construct a 50 storey office and retail building with 5 levels below grade parking 271 spaces and 528 bicycle parking; L02 conn…
Page numbers are hidden until the total count is available from the data service.