Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
HVAC - Proposal for Interior Alterations on 49th and 50th floor for Tenant Occupancy
Proposal for Interior Alterations on 49th and 50th floor for Tenant Occupancy
Plumbing - Proposal for Interior Alterations on 49th and 50th floor for Tenant Occupancy
HVAC - Proposal for interior alterations for new meeting rooms, lounge spaces, wellness room & pantry.
Proposal for interior alterations for new meeting rooms, lounge spaces, wellness room & pantry.
Plumbing - Proposal for interior alterations for new meeting rooms, lounge spaces, wellness room & pantry.
To erect and display one illuminated roof sign.***CIBC***
To erect and display one illuminated roof sign.***CIBC***
Alternative solution for the use of a 3M Emat fire wrap product to protect a Toronto Hydro duct bank, in connection with 141 Bay Street - 20 105721 BLD 03
REV02: Proposed revision for addition of exhaust fanRevision to HVAC - 47th floor: Proposed new interior alterations to include new open work space, enclosed offices and meeting rooms, cafe stations
REV01: Proposed revision relocating FPTU from elevator lobby to corridor on L41-45. Addition of exhaust fanHVAC - Proposed interior alterations - New interior construction to include new open work …
Rev 03: Revision to LEVEL 06 - EASTA new demising partition is added to the original room 0650, dividing it into rooms 0649-1 and0650,Interior Alterations - Fit-out on floors 5 through 25 to accomm…
Rev 03: proposal to revise hvac layoutsHVAC - Interior Alterations - Fit-out on floors 5 through 25 to accommodate tenant (CIBC)
Revision 01 - Revision to Relocated FEVC from corridor wall 47408 to corridor wall 47405 new breakout area. FVC distance also revised. Revised tag and combined FVC& Fe to FEVC near filling 47201: P…
Revision: see cover letter attached
Proposal to install six electromagnetic locks.
Revision 01: Proposal to revise hvacHVAC - Proposal for interior alterations over 10 floors for a new Group D office tenant (CPP) in an existing high-rise. Scope includes structural, HVAC, electric…
Proposal for 80 electromagnetic locks on 10 floors (Floors 31-40).
Revision to HVAC - 47th floor: Proposed new interior alterations to include new open work space, enclosed offices and meeting rooms, cafe stations
Page numbers are hidden until the total count is available from the data service.