1480 BLOOR ST W
REV 01 - Revision to Design and construction of a new pedestrian tunnel to the Bloor GO Station via Randolph Avenue. Part of Metrolinx GO Expansion Project Kitchener Trackwork (Weston Subdivision).…
Showing first 8 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV 01 - Revision to Design and construction of a new pedestrian tunnel to the Bloor GO Station via Randolph Avenue. Part of Metrolinx GO Expansion Project Kitchener Trackwork (Weston Subdivision).…
FS - Sprinkler Shop Drawing - Design and construction of a new pedestrian tunnel to the Bloor GO Station via Randolph Avenue. Part of Metrolinx GO Expansion Project Kitchener Trackwork (Weston Subd…
HVAC - Design and construction of a new pedestrian tunnel to the Bloor GO Station via Randolph Avenue. Part of Metrolinx GO Expansion Project Kitchener Trackwork (Weston Subdivision).
Plumbing - Design and construction of a new pedestrian tunnel to the Bloor GO Station via Randolph Avenue. Part of Metrolinx GO Expansion Project Kitchener Trackwork (Weston Subdivision).
proposed to separate the new access structure from the existing building by a 1-hour rated fire separation
requirements regarding the spatial separation and exposure protection requirements for the south face of the new access pavilion structure.
2022-06-06and construction of a new pedestrian tunnel to the Bloor GO Station via Randolph Avenue. Part of Metrolinx GO Expansion Project Kitchener Trackwork (Weston Subdivision).
INSTALL 6" SANITARY DRAINS, 4" WATER SERVICE B.P. 377654 2 W.C., 2 W.B., IN GO STATION TICKET BOOTH
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.