150 BLOOR ST W
HVAC - Proposed interior alterations to existing office space, including the construction of one gypsum board partition to create two enclosed offices, with associated electrical and mechanical work
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
HVAC - Proposed interior alterations to existing office space, including the construction of one gypsum board partition to create two enclosed offices, with associated electrical and mechanical work
Proposed interior alterations to existing office space, including the construction of one gypsum board partition to create two enclosed offices, with associated electrical and mechanical work
Sprinklers Alteration - review of submitted drawings sprinklers only
Proposal to install electromagnectic lock on a double door.
Proposed interior Interior Fit out and Tenant improvement to existing client space . Renovate offices with new flooring, and additional meeting room. Modification to existing mechanical and electri…
Plumbing - Proposed interior Interior Fit out and Tenant improvement to existing client space . Renovate offices with new flooring, and additional meeting room. Modification to existing mechanical …
HVAC - Proposed interior Interior Fit out and Tenant improvement to existing client space . Renovate offices with new flooring, and additional meeting room. Modification to existing mechanical and …
7 SIGNS = 2 wall signs on 1st storey, south elevation, 2 window signs on 1st storey, south elevation, 1 wall sign 1st storey, West elevation, 1 Wall sign 2nd storey, West elevation, 1 projecting si…
REV 02: Revision to barrier free washroom.Proposed interior alterations to existing commercial office 6th floor
Repairs to the interior parking garage / loading dock including localized concrete repairs, replacement of the existing suspended slab waterproofing system.
Revsion to Plumbing - Proposed interior alterations to existing commercial office 6th floor
Revision to HVAC - Proposed interior alterations to existing commercial office 6th floor
Revision to include a new staircase and rated enclosureProposed interior alterations to existing commercial office 6th floor
Proposed new restaurant in an existing ground and mezzanine level tenant space at 150 Bloor Street West. There will be 100 dining seats on the ground floor and 130 dining seats at the mezzanine lev…
Proposal for interior alterations which include addition of two internal metal frame walls with gypsum board. Restaurant Coffee Shop - Group E - Max Occupant Load 10 persons (patrons and staff)
Plumbing - Proposed interior alterations to existing commercial office 6th floor
Proposed interior alterations to existing commercial office 6th floor
HVAC - Proposed interior alterations to existing commercial office 6th floor
Interior alterations to create a new structural platform for workers to reach the piping system in the shaft to repair the roof drain leak. on the 25th floor
Demolition scope of work deleted: all existing partitions to remainProposal for interior alterations to the existing office spaces on the entire 7th floor level & portion of the 5th floor level. Re…
Page numbers are hidden until the total count is available from the data service.