Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
HVAC - Proposal for interior alterations to clinic and offices on ground and second floors.
Plumbing - Proposal for interior alterations to clinic and offices on ground and second floors.
Fire alarm panel, nodes, and annunciator replacements
Rev- Revision to proposed magnetic lock permitProposed magnetic lock installation at new door in east corridor.
REVISION 01: REVISION TO PERMIT 24 131844 BLD 00 BA. CHANGE FIRE DETECTION AND ALARM DEVICES.INTERIOR ALTERATIONS AT FIFTH FLOOR, EAST AND WEST WING.
Proposed magnetic lock installation at new door in east corridor.
MAGNETIC LOCK AT NEW DOOR IN EAST CORRIDOR
INTERIOR ALTERATIONS AT FIFTH FLOOR, EAST AND WEST WING.
HVAC - INTERIOR ALTERATIONS AT FIFTH FLOOR, EAST AND WEST WING.
To erect and display one static non-illuminated wall sign.**JASON SMITH RESEARCH CENTRE**
FS - Sprinkler Shop Drawing - Addition to extend the fourth and fifth floors to the north, as well as renovation of the fourth and fifth floor bridge link, to facilitate, meeting rooms, data collec…
HVAC - Addition to extend the fourth and fifth floors to the north, as well as renovation of the fourth and fifth floor bridge link, to facilitate, meeting rooms, data collection rooms, gallery, ch…
Addition to extend the fourth and fifth floors to the north, as well as renovation of the fourth and fifth floor bridge link, to facilitate, meeting rooms, data collection rooms, gallery, change ro…
Plumbing - Addition to extend the fourth and fifth floors to the north, as well as renovation of the fourth and fifth floor bridge link, to facilitate, meeting rooms, data collection rooms, gallery…
Drain - Addition to extend the fourth and fifth floors to the north, as well as renovation of the fourth and fifth floor bridge link, to facilitate, meeting rooms, data collection rooms, gallery, c…
FS - Sprinkler Shop Drawing - Demoltion and reconfiguration of offices, meeting rooms, data collection rooms, staff rooms and storage. The provision of two new washrooms. The reconfiguration of the…
Remove and replace storm drain piping, replace of 19mm piping for domestic cold water: 86meters-2 x water bottle filling stations & 4 x new hose bibs c/w shut off valves and drain ports
HVAC - Demoltion and reconfiguration of offices, meeting rooms, data collection rooms, staff rooms and storage. The provision of two new washrooms. The reconfiguration of the mechanical, electrical…
Plumbing - Demoltion and reconfiguration of offices, meeting rooms, data collection rooms, staff rooms and storage. The provision of two new washrooms. The reconfiguration of the mechanical, electr…
Page numbers are hidden until the total count is available from the data service.