Showing first 13 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REVISION - interior layout changes due to onsite conditionsProposal for interior alterations and renovation of the ground floor lobby/amenities & 2nd floor hallway/party hall/outdoor amenities. Dem…
Revision to HVAC permit 21-159664 HVA (original HVAC permit is closed)Unit 4-1406 typical area/layout/scope of work (Unit 4-1405) but mirrored. All drawings/details architectural/mechanical/electri…
Revision no. 1 - Unit 4-1406) typical area/layout/sope of work (Unit 4-1405) but mirrored. All drawings/details architectural/mechanical/electrical pertaining to Unit 4-1405)
Revision to (unit 4-1406) typical area/layout/sope of work (unit 4-1405) but mirrored. all drawings/details architectural/mechanical/electrical pertining to unit 4-1405)Revsion to 21 159664 hvac wa…
Revision to (unit 4-1406) typical area/layout/sope of work (unit 4-1405) but mirrored. all drawings/details architectural/mechanical/electrical pertining to unit 4-1405)Proposal for Interior Altera…
Repairs to the balcony slab repairs, thin waterproofing system application to all balconies
HVAC - Proposal for interior alterations and renovation of the ground floor lobby/amenities & 2nd floor hallway/party hall/outdoor amenities. Demolish and construct part of ground floor/2nd floor -…
Plumbing - Proposal for interior alterations and renovation of the ground floor lobby/amenities & 2nd floor hallway/party hall/outdoor amenities. Demolish and construct part of ground floor/2nd flo…
Proposal for interior alterations and renovation of the ground floor lobby/amenities & 2nd floor hallway/party hall/outdoor amenities. Demolish and construct part of ground floor/2nd floor - lobby …
Proposal for Interior Alterations to Unit 4-1405 and Unit 1605 in the existing Apartment Building.
HVAC - Proposal for Interior Alterations to the existing Apartment Building.
To replace Kitec domestic water piping in concerete slab with new Pex overhead piping in all suites.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.