1510 BIRCHMOUNT RD
Proposal to install 4 padel courts in vacant warehouse, open non-loading bearing block walls for entrance and glass window/doors, add 2 unisex washrooms, shower, change room, cafe counter, lobby ar…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal to install 4 padel courts in vacant warehouse, open non-loading bearing block walls for entrance and glass window/doors, add 2 unisex washrooms, shower, change room, cafe counter, lobby ar…
HVAC - Proposal to install 4 padel courts in vacant warehouse, open non-loading bearing block walls for entrance and glass window/doors, add 2 unisex washrooms, shower, change room, cafe counter, l…
Plumbing - Proposal to install 4 padel courts in vacant warehouse, open non-loading bearing block walls for entrance and glass window/doors, add 2 unisex washrooms, shower, change room, cafe counte…
Revision 01: Proposal to revise storage. Proposal for Interior Alteration to Unit 200 with new Plumbing and HVAC.
REV 01: Change to HVAC design to make use of existing HRV system. HVAC - Proposed new partition wall for the new office spaces and working area and extend the existing heating system to the new spa…
Plumbing - Proposal for Interior Alteration to Unit 200 with new Plumbing and HVAC.
Proposal for Interior Alteration to Unit 200 with new Plumbing and HVAC.
HVAC - Proposal for Interior Alteration to Unit 200 with new Plumbing and HVAC.
Proposed new partition wall for the new office spaces and working area and extend the existing heating system to the new spaces. Proposal to combine unit 208 and unit 209.
HVAC - Proposed new partition wall for the new office spaces and working area and extend the existing heating system to the new spaces. Proposal to combine unit 208 and unit 209.
Proposed: Partial Demolition of Existing building 3 areas part of the larger building.
Proposed installation of glazed curtain wall on part of the existing Industrial/Commercial building facade and tied into ex ting wall below and existing roof above. The location of work is limited …
interior alterations to second floor, Units 201,202,203,204,210 and 225, school and recreation areas
HVAC - Interior alterations to second floor, Units 201,202,203,204,210 and 225, school and recreation areas
Interior alterations to ground floor, Units 102b,104,126,130,150,162
HVAC - Interior alterations to ground floor, Units 102b,104,126,130,150,162
Plumbing - Interior alterations to ground floor, Units 102b,104,126,130,150,162
Plumbing - Interior alterations to second floor, Units 201,202,203,204,210 and 225, school and recreation areas
Rev #1 - As built drawings for HVACHVAC - UNIT 203 - interior alterations (Kuman Educational for English & Math between the hours of 4pm - 7pm)
alteration to PLB & HVAC UNIT 100
Page numbers are hidden until the total count is available from the data service.