155 UNIVERSITY AVE
Revision 03 - The ceiling layout and mechanical layout have been revised. All affected lighting fixtures and mechanical fixtures are relocated to suit the new layout.REV02: Proposed revision as per…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 03 - The ceiling layout and mechanical layout have been revised. All affected lighting fixtures and mechanical fixtures are relocated to suit the new layout.REV02: Proposed revision as per…
Revision 02 - The ceiling layout and mechanical layout have been revised. All affected lighting fixtures and mechanical fixtures are relocated to suit the new layout.Revision 01: Revision to permit…
Revision to The ceiling layout and mechanical layout have been revised. All affected lighting fixtures and mechanical fixtures are relocated to suit the new layout.Revision 01: Revision to permit, …
REV02: Proposed revision as per drawingsRevision 01: Revision to permit, refer to attached addendumDEMOLISHING INTERIOR WALL PARTITIONS. BUILDING NEW WALLS FOR NEW OFFICES AND KITCHEN.
Revision 01: Revision to permit, refer to attached addendumDEMOLISHING INTERIOR WALL PARTITIONS. BUILDING NEW WALLS FOR NEW OFFICES AND KITCHEN.
Revision 01: Revision to permit, refer to attached addendumHVAC - DEMOLISHING INTERIOR WALL PARTITIONS. BUILDING NEW WALLS FOR NEW OFFICES AND KITCHEN.
Revision 01: Revision to permit, refer to attached addendumPlumbing - DEMOLISHING INTERIOR WALL PARTITIONS. BUILDING NEW WALLS FOR NEW OFFICES AND KITCHEN.
Proposal to replace faulty existing 1-1/2" RP backflow device with a new 1-1/2" RP backflow
DEMOLISHING INTERIOR WALL PARTITIONS. BUILDING NEW WALLS FOR NEW OFFICES AND KITCHEN.
HVAC - DEMOLISHING INTERIOR WALL PARTITIONS. BUILDING NEW WALLS FOR NEW OFFICES AND KITCHEN.
Plumbing - DEMOLISHING INTERIOR WALL PARTITIONS. BUILDING NEW WALLS FOR NEW OFFICES AND KITCHEN.
Revision 01: Proposal to revise layout. Proposal for renovations for ACS Infrastructure.
Revision 01: Proposal to revise layout.HVAC - Proposal for renovations for ACS Infrastructure.
HVAC - Proposal for renovations for ACS Infrastructure.
Proposal for renovations for ACS Infrastructure.
Rev 02: revision to add Fire Protection Plan and Electrical drawings to permit. As-build Spirnkler drawing provided as reference , no changes to sprinklersRevision 01: We are applying for the elect…
Revision 01: We are applying for the electrical permit on the already issued interior alteration office permit. Original permit was issued for the mechanical (24 230953 PLB 00 PS) and architectural…
HVAC - PROPOSAL FOR INTERIOR ALTERATION OF EXISTING OFFICE FOR NEW TENANT FIT OUT.
PROPOSAL FOR INTERIOR ALTERATION OF EXISTING OFFICE FOR NEW TENANT FIT OUT.
Installation of new roof anchors, west side of roof to improve swing stage and bosun's chair window cleaning and exterior cladding maintenance access.
Page numbers are hidden until the total count is available from the data service.