158 RANDOLPH RD
Revision to HVAC - due to removal of previously proposed liveable third level the HVAC package has been revised to remove the secondary furnace unit from the attic and increase the capacity of the …
Showing first 12 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision to HVAC - due to removal of previously proposed liveable third level the HVAC package has been revised to remove the secondary furnace unit from the attic and increase the capacity of the …
Drain - Proposed laneway suite in rear yard
Drain - Proposed new single family dwelling
Revision 01 - changes to FSI increased to 0.86 (max. 0.60), 100mm bump out at north sideyard setback, front and rear yard landscape 50% & 80% respectively in lieu of min. 75% & 85%, front yard park…
Revision 01- to make changes to the roof see bubble plans. Proposed laneway suite in rear yard
HVAC - Proposed laneway suite in rear yard
HVAC - Proposed new single family dwelling
Plumbing - Proposed new single family dwelling
Plumbing - Proposed laneway suite in rear yard
Proposed laneway suite in rear yard
Proposal to demolish the existing 1 storey SFD-detached dwelling and detached garage.
Proposed new single family dwelling
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.