160 BARTLETT AVE
Proposed replacement of the existing front basement exterior walkout stair with new; new sump pit & pump, and related plumbing.
Showing first 9 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposed replacement of the existing front basement exterior walkout stair with new; new sump pit & pump, and related plumbing.
Plumbing - REPLACEMENT OF EXISTING FRONT BASEMENT EXTERIOR WALKOUT STAIR WITH NEW; NEW SUMP PIT & PUMP, AND RELATED PLUMBING
HVAC - Convert existing rear detached garage into a two storey laneway suite
Proposal to convert existing rear detached garage into a two storey laneway suite.**** See ZZC Drawings ****
Plumbing - Convert existing rear detached garage into a two storey laneway suite
Proposal to carry out interior alterations to the basement
Plumbing - Proposed interior alterations to second floor.
Proposed interior alterations to second floor.
Drain - Proposed interior alterations to second floor.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.