161 COMMANDER BLVD
HVAC - Proposed interior alterations to existing industrial cosmetic manufacturing/compounding facility, including modifications to the reflected ceiling plan (RCP), ceiling assemblies, and associa…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
HVAC - Proposed interior alterations to existing industrial cosmetic manufacturing/compounding facility, including modifications to the reflected ceiling plan (RCP), ceiling assemblies, and associa…
Proposed interior alterations to existing industrial cosmetic manufacturing/compounding facility, including modifications to the reflected ceiling plan (RCP), ceiling assemblies, and associated roo…
To replace existing 4" premise isolation backflow preventer and install an additional 3" backflow preventer for premise isolation - Estee Lauder Cosmetics
REVISION 06 - REVISION TO PERMIT # 22 114146REVISIONS HAVE BEEN MADE TO REFLECT ONSITE CONSTRUCTION. AS WELL AS THECONSTRUCTION OF THE TEMPORARY MAINTENANCE SHOP REPLACING THE CURRENTCLEANING ROOM …
REV Plumbing - interior alterations to existing industrial building
REV - HVAC - interior alterations to existing industrial building
REV 04 - Revision to HVAC REVISION 3 - includes details to new washrooms and locker room layouts, new interior mezzanine stairs
REVISION 05: INCLUDES UPDATED DRAWINGS TO MEZZANINE PLAN TO INDICATE FIRE RATING REQUIREMENTSREVISION 04: INCLUDES UPDATED OBC MATRIX TO INDICATE FIRE SEPARATE BETWEEN FLOORSREVISION 3 - includes d…
REVISION 04: INCLUDES UPDATED OBC MATRIX TO INDICATE FIRE SEPARATE BETWEEN FLOORSREVISION 3 - includes details to new washrooms and locker room layouts, new interior mezzanine stairs
Proposed addition of new exterior 6" sanitary line to the building
REVISION 3 - includes details to new washrooms and locker room layouts, new interior mezzanine stairs
REVISION 3 - includes details to new washrooms and locker room layouts, new interior mezzanine stairs
REVISION 3 - includes details to new washrooms and locker room layouts, new interior mezzanine stairs
Revision 02: Details for elevator shaft, mechanical units platform on roof modified. mechanical and structural modified to suit scope of revision. Revision to HVAC - addition of airlocks around the…
Revision 02: Details for elevator shaft, mechanical units platform on roof modified. mechanical and structural modified to suit scope of revision. Revision to Plumbing - addition of airlocks around…
Revision 02: Details for elevator shaft, mechanical units platform on roof modified. mechanical and structural modified to suit scope of revision. Revision - addition of airlocks around the warehou…
PROPOSED: INSTALLATION OF 6" UNDERGROUND STORM DRAINS HAS CHANGED LOCATIONS AS SHOWN ON PREVIOUS PERMIT 19 210309 STS (ESTEE LAUDER)
Revision - addition of airlocks around the warehouse, minor changes to "pre weigh" room layout. mechanical structural, electrical modified to suit scope of revision.
Revision to HVAC - addition of airlocks around the warehouse, minor changes to "pre weigh" room layout. mechanical structural, electrical modified to suit scope of revision.
Revision to Plumbing - addition of airlocks around the warehouse, minor changes to "pre weigh" room layout. mechanical structural, electrical modified to suit scope of revision.
Page numbers are hidden until the total count is available from the data service.