165 CANON JACKSON DR
Sequence of the fire alarm signalling in a single stage fire alarm system - Bldg R
Showing first 8 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Sequence of the fire alarm signalling in a single stage fire alarm system - Bldg R
Revision as per building - Layouts of some units have changed. No changes to structural walls, exit stairs, elevators, number of units, or elevations. Changes are detailed in the attached sheetPlum…
Revision as per building - Layouts of some units have changed. No changes to structural walls, exit stairs, elevators, number of units, or elevations. Changes are detailed in the attached sheet.HVA…
Revision to existing permit - Layouts of some units have changed. No changes to structural walls, exit stairs, elevators, number of units, or elevations. Changes are detailed in the attached sheet.…
AS-FIRE ALARM SIGNAL STAGINGConstruct a 6 storey midrise building with 88 units on top of and underground garage. Building R
Construct a 6 storey midrise building with 88 units on top of and underground garage. Building R
Plumbing - Construct a 6 storey midrise building with 88 units on top of and underground garage. Building R
HVAC - Construct a 6 storey midrise building with 88 units on top of and underground garage. Building R
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.