167 BROWNING AVE
HVAC - REV 01: PROPOSAL TO ADD HRV IN THE MECHANICAL SYSTEM.HVAC - Interior alterations to ground, second and third floor area of existing dwelling
Showing first 8 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
HVAC - REV 01: PROPOSAL TO ADD HRV IN THE MECHANICAL SYSTEM.HVAC - Interior alterations to ground, second and third floor area of existing dwelling
HVAC - Interior alterations to ground, second and third floor area of existing dwelling
Plumbing - Interior alterations to ground, second and third floor area of existing dwelling
Interior alterations to ground, second and third floor area of existing dwelling
Rev 1 - Proposed finished basement.Proposed underpinning (30.4m) of existing basement foundations.
Plumbing - Proposed underpinning (30.4m) of existing basement foundations.
Drain - Proposed underpinning (30.4m) of existing basement foundations.
Proposed underpinning (30.4m) of existing basement foundations.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.