170 BLOOR ST W
HVAC - Addition of new exterior door, construction of new interior partition, reinstallation of interior metal corner trim piece.
Showing first 11 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
HVAC - Addition of new exterior door, construction of new interior partition, reinstallation of interior metal corner trim piece.
Addition of new exterior door, construction of new interior partition, reinstallation of interior metal cornertrim piece.
Proposal for interior alterations to existing retail store
HVAC - Proposal for interior alterations to existing retail store
Plumbing - Proposal for interior alterations to existing retail store
proposing ground floor demising renovations of tenant space with three new tenant exterior doors
HVAC - proposing ground floor demising renovations of tenant space with three new tenant exterior doors
HVAC - Project includes interior alterations for Group D occupancy subdivided in 2 levels, ground level 1 and second level. The work includes: interconnecting stair, bridge, LULA elevator, washroom…
Plumbing - Project includes interior alterations for Group D occupancy subdivided in 2 levels, ground level 1 and second level. The work includes: interconnecting stair, bridge, LULA elevator, wash…
Project includes interior alterations for Group D occupancy subdivided in 2 levels, ground level 1 and second level. The work includes: interconnecting stair, bridge, LULA elevator, washrooms, 1 un…
Early works permit for interior alterations intended to be a continuous contruction. Scope includes infilling, existing openings and cutting a new stair.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.