Showing first 20 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 01: Revised area bubbled in drawings. SEPARATE REVISION 02 PERMIT: NOTE: ARCHITECTURAL DESIGN+GRCC FOR ALTERATIONS TO PUBLIC CORRIDOR FIRE SEPARATION + ALTERATIONS TO COLUMN FIRE PROTECTION
REV01: Proposed revision to plumbing for UNIT 203 - re addition of sinks and drainsPlumbing - Proposal for interior alterations to existing suites 201 & 203 - no change of use. SEPARATE PERMISSION …
HVAC - Proposal for interior alterations to existing suites 201 & 203 - no change of use. SEPARATE PERMISSION REQUIRED FOR ALTERATIONS TO PUBLIC CORRIDORFIRE SEPARATION AND STRUCTURAL FIRE PROTECTION
Plumbing - Proposal for interior alterations to existing suites 201 & 203 - no change of use. SEPARATE PERMISSION REQUIRED FOR ALTERATIONS TO PUBLIC CORRIDORFIRE SEPARATION AND STRUCTURAL FIRE PROT…
REV 01: Addition of fire rated door and sidelights to previously issued office layout for suite 202.
Proposal for interior alterations to existing suites 201 & 203 - no change of use. SEPARATE PERMISSION REQUIRED FOR ALTERATIONS TO PUBLIC CORRIDORFIRE SEPARATION AND STRUCTURAL FIRE PROTECTION
REV 01:2 washrooms increased in length and new drywall ceiling installed under open web steel joists.HVAC - Convert the existing space to a private Pilates Studio in Unit 102
REV 01: 2 washrooms increased in length and new drywall ceiling installed under open web steel joists.Plumbing - Convert the existing space to a private Pilates Studio in Unit 102
Rev 01: 2 washrooms increased in length and new drywall ceiling installed under open web steel joists.Convert the existing space to a private Pilates Studio in Unit 102
Proposal to perform interior alterations to the office layout.
HVAC - Proposal to perform interior alterations to the office layout.
Plumbing - Proposal to perform interior alterations to the office layout.
Convert the existing space to a private Pilates Studio in Unit 102
HVAC - Convert the existing space to a private Pilates Studio in Unit 102
Plumbing - Convert the existing space to a private Pilates Studio in Unit 102
Application for a permit to erect one (1) electronic ground sign, displaying electronic static copy, associated with a drive-through facility. See SV# 24 142602Dimensions: 1.27m (L) x 0.95m(W) at a…
REV01: Proposed revision for removal of door 108 and door 109 on the ground floor, addition of door 108c on the ground floor Interior alterations to the existing three storey office buidling
New Mag Lock installed on third floor door 303 which connects Corridor 321 with Reception 303. Please refer to the attached architectural sheet and spec sheet
addition of fire/smoke dampers on the ground and second floor
Updated Nov 20, 2026