190 NORSEMAN ST
Fire Security Upgrade (FSU) related to 24 117425 BLD 00 BA Interior alterations -ground floor( suite 200) and basement(suite 500).
Showing first 20 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Fire Security Upgrade (FSU) related to 24 117425 BLD 00 BA Interior alterations -ground floor( suite 200) and basement(suite 500).
1 Wall Sign1 Ground Sign
Revision to Plumbing due to site conditions - ground floor suite 200 and basement suite 500
Interior alterations for recently renovated multi-unit office building - ground floor suite 200 and basement suite 500
Plumbing - Interior alterations for recently renovated multi-unit office building - ground floor suite 200 and basement suite 500
HVAC - Interior alterations for recently renovated multi-unit office building - ground floor suite 200 and basement suite 500
Rev 04 - unit will be used as office only. Vehicle storage not required anymore. Adding connection to the stairwell from the upper level of suite 200REV #3-ENCLOSE VEHICLE STORAGE IN SUITE 200 WITH…
Rev 04 - unit will be used as office only. Vehicle storage not required anymore. Adding connection to the stairwell from the upper level of suite 200REV #3-ENCLOSE VEHICLE STORAGE IN SUITE 200 WITH…
REV #3-ENCLOSE VEHICLE STORAGE IN SUITE 200 WITH 1.5 HR FIRE RATINGHVAC - Proposed conversion of an office/clothing factory/warehouse into office space; partial demolition of existing portion (117m…
REV #3-ENCLOSE VEHICLE STORAGE IN SUITE 200 WITH 1.5 HR FIRE RATINGProposed conversion of an office/clothing factory/warehouse into office space; partial demolition of existing portion (117m2), int…
Revision 02- Suite 100 Barrier-free entrance has been revised to accommodate a double door and ramp has been reconfigured, interior partitions have been added to suite 100 to accommodate office/pri…
Revision 02- Suite 100 Barrier-free entrance has been revised to accommodate a double door and ramp has been reconfigured, interior partitions have been added to suite 100 to accommodate office/pri…
Revision 01- Suite 100 Barrier-free entrance has been revised to accommodate a double door and ramp has been reconfigured, interior partitions have been added to suite 100 to accommodate office/pri…
Revision 02- Suite 100 Barrier-free entrance has been revised to accommodate a double door and ramp has been reconfigured, interior partitions have been added to suite 100 to accommodate office/pri…
HVAC - Proposed conversion of an office/clothing factory/warehouse into office space; partial demolition of existing portion (117m2), interior alterations including construction of new mezzanines (…
Plumbing - Proposed conversion of an office/clothing factory/warehouse into office space; partial demolition of existing portion (117m2), interior alterations including construction of new mezzanin…
Revision 01- Interior alterations including construction of new partitions, washrooms and exterior upgrades. Proposed conversion of an office/clothing factory/warehouse into office space; partial d…
Proposal to install a fire line for sprinklers in an existing office building.
FS - Sprinkler Shop Drawing - Proposed conversion of an office/clothing factory/warehouse into office space; partial demolition of existing portion (117m2), interior alterations including construct…
Proposed conversion of an office/clothing factory/warehouse into office space; partial demolition of existing portion (117m2), interior alterations including construction of new mezzanines (259m2),…