192 NEVILLE PARK BLVD
REV #3- switch west wall of WORKSHOP STORAGE (above garage) from framed to 10¿ conc block due to existing grade. New basement window on west wall in WORKSHOP STORAGE room & remove exist 2x4 framed …
Showing first 4 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV #3- switch west wall of WORKSHOP STORAGE (above garage) from framed to 10¿ conc block due to existing grade. New basement window on west wall in WORKSHOP STORAGE room & remove exist 2x4 framed …
Revision to construct a 2 storey side yard addition over attached garage and ground floor rear deck.
Revision 01 - Proposed revision to relocate 3rd floor ridge beam, shorten 2nd floor rear cantilever, new windows on north elevation and revised interior layout.Proposal to construct a third floor a…
Proposal to construct a third floor addition and a 3 storey rear addition (186.47m2), make interior alterations to all floors (123.35m2), basement finishing (87.39m2) and construct 1 new front porc…
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.