1950 BATHURST ST
HVAC - Interior renovations to existing office and classroom areas including minorpartition relocation and replacement of finishes and fixtures.
Showing first 18 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
HVAC - Interior renovations to existing office and classroom areas including minorpartition relocation and replacement of finishes and fixtures.
Plumbing - Interior renovations to existing office and classroom areas including minorpartition relocation and replacement of finishes and fixtures.
Interior renovations to existing office and classroom areas including minorpartition relocation and replacement of finishes and fixtures.
Proposal to install 2 electromagnetic locks on level 2 and 3.
1 certified temporary tent. 30ft x 75ft Archtop Rigid Frame, no walls, and anchored with steel stakes. (Cert# 14 251040) Installed September 2 to 20th 2021.
replace boiler for heating
install 2 rooftop HVAC units
REVISION 3 - provide additional security to school wingProposal for Phase 1: interior demolition, interior alterations, and new south addition in existing place of worship - Holy Blossom Temple.
REVISION 2 - Landscape layout changes to Ava Road entry to provide new security provisions and amend the layout of the carpark and carpark capacity.
Proposal to install 2 electromagnetic locks to existing place of worship building. "HOLY BLOSSOM TEMPLE"
Revision to split 150mm rain-water leader to two separate 150mm lines to deal with existing site condition (Split is proposed through the use of a 150mm x 150mm x 150mm wye fitting, installed in th…
Revision to address changes made in approved alternative solution #16-213475.
Proposal for Phase 1: interior demolition, interior alterations, and new south addition in existing place of worship - Holy Blossom Temple.
HVAC - Proposal for interior demolition, interior alterations, and new front addition in existing place of worship - "Holy Blossom Temple Renewal" - Phase 1.
Plumbing - Proposal for interior demolition, interior alterations, and new front addition in existing place of worship - "Holy Blossom Temple Renewal" - Phase 1.
Proposal to install a total of 3 backflow prevention devices. 2 devices located in school portion of building and 1 located in church portion of building.
Interior alterations to existing classrooms, existing nursury and administration offices.
Interior alteration by removing raised floor and millwork at 3rd floor
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.