2075 BAYVIEW AVE
HVAC - INTERIOR ALTERATIONS TO AN EXISTING AREA WITHIN THE HOSPITAL LOCATED ON THE GROUND FLOOR OF T-WING. THE SCOPE OF WORK INCLUDES PARTIAL DEMOLITION OF EXISTING AREAS AND NEW INTERIOR FINISHES …
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
HVAC - INTERIOR ALTERATIONS TO AN EXISTING AREA WITHIN THE HOSPITAL LOCATED ON THE GROUND FLOOR OF T-WING. THE SCOPE OF WORK INCLUDES PARTIAL DEMOLITION OF EXISTING AREAS AND NEW INTERIOR FINISHES …
INTERIOR ALTERATIONS TO AN EXISTING AREA WITHIN THE HOSPITAL LOCATED ON THE GROUND FLOOR OF T-WING. THE SCOPE OF WORK INCLUDES PARTIAL DEMOLITION OF EXISTING AREAS AND NEW INTERIOR FINISHES AND MEC…
Plumbing - INTERIOR ALTERATIONS TO AN EXISTING AREA WITHIN THE HOSPITAL LOCATED ON THE GROUND FLOOR OF T-WING. THE SCOPE OF WORK INCLUDES PARTIAL DEMOLITION OF EXISTING AREAS AND NEW INTERIOR FINIS…
Proposal to design and install a modification to the existing preaction sprinkler system to suit renovations in room TG66 on the ground floor of Sunnybrook HSC T-Wing. The starting point is the exi…
Plumbing - Sunnybrook Health Sciences Centre Emergency Department Renovations.
Sunnybrook Health Sciences Centre Emergency Department Renovations.
HVAC - Sunnybrook Health Sciences Centre Emergency Department Renovations.
Modifications to an existing wet sprinkler system inside the basement level of the H-Wing at Sunny brook health sciences centre. OBC Class B2 Care and Treatment.
HVAC - INTERIOR RENOVATIONS OF ROOM AG-15 ON GROUND FLOOR for a PET CT.
INTERIOR RENOVATIONS OF ROOM AG-15 ON GROUND FLOOR for a PET CT.
Plumbing - INTERIOR RENOVATIONS OF ROOM AG-15 ON GROUND FLOOR for a PET CT.
INSTALLATION OF 5 OUTDOOR GATES COMPLETE WITH MAGLOKCS IN COURTYARD AREA OF GARRY HURVITZ WING (G WING)
Proposed fire sprinkler system- MRI room on ground floor
Proposed fire sprinkler system - tunnel in basement
1. Sprinkler system modifications on the ground floor of C wing room CG-68 IT room2. Remove existing supervised valve within room CG-683. Remove existing supervised valve within room CG-66.
This project consists in designing and converting the existing wet-pipe sprinkler system in(UPS Room MB-004) to a pre-action configuration. Modify the piping network to integrate with the building'…
PROPOSED INTERIOR ALTERATIONS TO LINAC TG-66 INCLUDING DEDICATED CONTROL CONSOLE AREA LOCATED ON THE GROUND FLOOR LEVEL OF SUNNYBROOK T WING ODETTE CANCER CENTRE BUILDING
Plumbing - PROPOSED INTERIOR ALTERATIONS TO LINAC TG-66 INCLUDING DEDICATED CONTROL CONSOLE AREA LOCATED ON THE GROUND FLOOR LEVEL OF SUNNYBROOK T WING ODETTE CANCER CENTRE BUILDING
HVAC - PROPOSED INTERIOR ALTERATIONS TO LINAC TG-66 INCLUDING DEDICATED CONTROL CONSOLE AREA LOCATED ON THE GROUND FLOOR LEVEL OF SUNNYBROOK T WING ODETTE CANCER CENTRE BUILDING
Proposal to install two (2) tents: one (1) 30'x30' and one (1) 30'x60'. Tents to be erected from June 4, 2026 to June 5, 2026 in parking lot 38.
Page numbers are hidden until the total count is available from the data service.