125 QUEENS QUAY E
Standalone Shoring and Excavation for Remediation purposes.
Some text filters were temporarily ignored because the data service timed out.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Standalone Shoring and Excavation for Remediation purposes.
Proposed underpinning to existing commercial building. (60 linear meters)
Conditional permit application for model A1 left side - 18 206917 B01 00 NH
To construct Foundation for a 12 Story Condo as well as Drain Permit
Proposed underpinning to existing commercial building. (60 linear meters)
Supply and Installation of free-standing Rack and Shelf storage system as per 3.16 of the OBC. Intended use is for the storage of merchandise.
Proposal for a prefabricated metal shed
Proposal for party wall admin permit related to 81 Woodington Ave- 26 264265 BLD 00 SR
Revision 1: HVAC - Proposal for interior alterations to an existing place of worship - "Wilson Kingdom Hall"
Plumbing - PROPOSED NEW SECOND DWELLING UNIT IN BASEMENT W/ NEW BELOW GRADE STAIRWELL AND UNDERPINNING OF BASEMENT FLOOR
REV01: Proposal to remain a single-family dwelling, interior alteration, load bearing wall removal, and relocation of existing drivewayConvert existing single dwelling to duplex.
Plumbing - Proposal for a 1 storey rear addition, underpinning, rear deck and interior alterations
REVISION-02 : Deletion of TF-1 and EF-4, plan adjusted accordinglyREV 01: Revision to permit, updates to include; Storage Room 115 - fume hood deleted; Lunchroom 118 + Boardroom 106 - VAV diffusers…
REV01: Proposal to revise floor to floor heights.Proposal for a two storey rear yard laneway suite with an integral parking space.
REV01: Proposal to revise floor to floor heights.Proposal to demolish the existing structure and construct a three storey four unit semi-detached Houseplex with a front porch, rear deck and front a…
HVAC - Proposed construction of the building shell and exterior envelope for the industrial expansion (Phases 1 & 2) at Gay Lea Clayson Rd. Scope includes the primary structural frame, masonry shaf…
Revision 01: AMENDMENT TO PERMIT # 26 153791 PLB 00 PSPlumbing - Proposed interior alterations for tenant fit-out of floors ground - three (partial ground). Fit-out to be for corporate office use.
Revision 01- AMENDMENT TO PERMIT # 26 153791 HVA 00 MSHVAC - Proposed interior alterations for tenant fit-out of floors ground - three (partial ground). Fit-out to be for corporate office use.
Drain - Proposal for interior alterations to create a fifth dwelling unit in the basement.
Revision 02: REVISION TO FRONT YARD LANDSCAPING.Revision 01: LANDSCAPING, EXCAVATED REAR DECK, REAR CANOPY, AND LANDSCAPING. Relocate bathroom, laundry room, new bathroom and smaller mech room. Pro…
Page numbers are hidden until the total count is available from the data service.