Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV02: Proposed revision as per drawingsRevision 01 - HVACHVAC - Proposal to construct interior alterations to a vacant retail space for Tahini' Mid -eastern Cuisine.
HVAC - Proposed interior alterations for fit up of existing condo retail space.
Revision 01 - HVACHVAC - Proposal to construct interior alterations to a vacant retail space for Tahini' Mid -eastern Cuisine.
Rev 01:- Revision Proposal to construct interior alterations to a vacant retail space for Tahini's Mideastern Cuisine.
REV:- PLUMBINGPlumbing - Proposal to construct interior alterations to a vacant retail space for Tahini¿s Mid -eastern Cuisine.
Plumbing - Proposed interior alterations for fit up of existing condo retail space.
Proposed interior alterations for fit up of existing condo retail space.
Revision #2 - Revise the number of Barrier Free Suites, in accordance with Sentence 3.8.2.1(5) of the 2012 Ontario Building Code. Refer to enclosed drawings.REV - Revision to Building Permit 17 269…
REV - Revision to Building Permit 17 269693 BLD 00 NBRevise the number of Barrier Free Suites, in accordance with Sentence 3.8.2.1(5) of the 2012 Ontario Building Code. Refer to enclosed drawings.
Plumbing - Proposal to construct interior alterations to a vacant retail space for Tahini¿s Mid -eastern Cuisine.
HVAC - Proposal to construct interior alterations to a vacant retail space for Tahini' Mid -eastern Cuisine.
Proposal to construct interior alterations to a vacant retail space for Tahini's Mideastern Cuisine.
Revision to drain permit.
REVISION#1: DRAIN REVISEDDrain - Proposal to construct 52-storey condo with 602 residential units, 6 levels of below grade parking, and ground floor commercial. 215 CHURCH ST, 223-229 CHURCH ST & 1…
Alternative solution for a standpipe riser within the exit stair shaft and delete the fire hose cabinets
Drain - Proposal to construct 52-storey condo with 602 residential units, 6 levels of below grade parking, and ground floor commercial. 215 CHURCH ST, 223-229 CHURCH ST & 117 DUNDAS ST E.
Revision #01 - Replacement of shoring anchors with tie-backs.Stand alone excavation and shoring for soil remediation.
Conditional Permit - Part Permit - Proposal to construct 52-storey condo with 602 residential units, 6 levels of below grade parking, and ground floor commercial. 215 CHURCH ST, 223-229 CHURCH ST &…
Stand alone excavation and shoring for soil remediation.
Page numbers are hidden until the total count is available from the data service.